> ## Content Index
> Fetch the complete content index at: https://www.sotkn.com/llms.txt
> Use this file to discover other available public pages before exploring further.

# What Is Cloud Egress? The Byte Is Billed on the Way Out
- URL: https://www.sotkn.com/explained/cloud-egress-explained/
- Published: 2026-11-17T01:20:54.000Z
- Updated: 2026-11-17T01:20:53.000Z
- Description: Cloud egress is data leaving a cloud, billed on the way out. Virginia’s first paid tier is US$0.090 per GB; Singapore’s is US$0.120. Inbound is zero. The meter that stays is the stuck step.
- Author: Sean
- Tags: #desk-explained, Mechanism

EXPLAINED · Mechanism · Last reviewed: 17 Nov 2026 · Next review: 12 January 2027, when EU Data Act Article 29 bans switching charges

Cloud egress is data that leaves a cloud provider’s network, counted in gigabytes and billed on the way out. The same byte arriving is a different line, and on the price cards checked for this page that line is free.

**In short.** A hyperscaler is paid when data leaves, not when it arrives. On Amazon’s price list of 17 November 2026 the first paid tier is US$0.090 per GB out of Northern Virginia and US$0.120 out of Singapore. Inbound is US$0.000\. Our read: the stuck step is the meter on bytes a customer keeps sending, not the one-time exit.

Why an investor cares: the GPU hour and the outbound byte are two bills. The hour is [reserved versus on-demand](https://www.sotkn.com/explained/reserved-vs-on-demand-gpu/). Egress, the second bill, sits on the [Hyperscalers](https://www.sotkn.com/stack/hyperscalers/) layer.

## What is cloud egress?

Cloud egress is outbound traffic. A file, a model answer, a video or a backup leaves the region where it was stored or computed, and the provider that sends it writes a per-gigabyte charge.

Ingress is the other direction: data coming in from the internet. On the cards below, ingress is priced at zero. The money is on the way out.

The price list has three flows: out to the internet, between regions, and inside one region, including between availability zones. Where a byte starts is [what a cloud region is](https://www.sotkn.com/explained/cloud-region-explained/). The city versus the building is [region versus availability zone](https://www.sotkn.com/explained/region-vs-availability-zone/).

## How do the three clouds price the way out?

Amazon’s rates are from its AWS Data Transfer offer file, published 17 November 2026 at 00:49 UTC. That file calls 10,240 GB the first 10 TB. Microsoft defines 1 TB as 1,000 GB, and Google uses gibibytes, so a gigabyte is not a gibibyte. The EC2 pricing page, fetched the same day, adds 100 GB of internet egress free each month, pooled except China and GovCloud. The file calls the paid tiers beyond that free tier.

| AWS data transfer out to the internet | US East (N. Virginia) | Asia Pacific (Singapore) |
| ------------------------------------- | --------------------- | ------------------------ |
| First paid tier, 0 to 10,240 GB       | US$0.090 per GB       | US$0.120 per GB          |
| Next tier, 10,240 to 51,200 GB        | US$0.085 per GB       | US$0.085 per GB          |
| Next tier, 51,200 to 153,600 GB       | US$0.070 per GB       | US$0.082 per GB          |
| Above 153,600 GB                      | US$0.050 per GB       | US$0.080 per GB          |
| Data transfer in from the internet    | US$0.000 per GB       | US$0.000 per GB          |

The first paid tier is what the file calls the first 10 TB beyond the free tier. A 1,024 GB send from Virginia inside that tier is 1,024 × US$0.090 = US$92.16, our arithmetic. From Singapore it is 1,024 × US$0.120 = US$122.88, a gap of US$30.72, one third higher: (0.120 − 0.090) / 0.090 = 33.3%. From 10,240 to 51,200 GB both regions are US$0.085, so the premium there is only that first-tier US$0.030\. Above 153,600 GB Virginia is US$0.050 and Singapore US$0.080, 60% higher (0.030 / 0.050), our arithmetic.

Microsoft’s bandwidth page, fetched 17 November 2026, prices internet egress on its premium network after a free 100 GB a month. From North America or Europe the next 10 TB — 10,000 GB, by Microsoft’s definition — is US$0.087 per GB. From Asia excluding China, Australia, and the Middle East and Africa, that next 10 TB is US$0.12 per GB, 37.9% higher, our arithmetic: (0.12 − 0.087) / 0.087\. Ingress is free. Transfer inside one availability zone is free.

Google’s VPC page, fetched the same day, says Premium Tier is the default. Internet egress to North America is free for the first 1 GiB a month, then US$0.12 per GiB up to 1,024 GiB, US$0.11 up to 10,240 GiB, and US$0.08 above that. Inbound is free. We do not convert gibibytes into Amazon’s gigabytes. None of the three pages prints a negotiated price, or egress as a share of revenue.

## What does it cost to move a byte inside the cloud?

Leaving for the internet is the expensive line. Moving between a company’s own regions is cheaper, and it is not zero.

On the same Amazon file, transfer from US East (Northern Virginia) to US West (Oregon), to EU (Ireland), or to Asia Pacific (Singapore) is US$0.020 per GB, with no further tiers. Our 1,024 GB example costs 1,024 × US$0.020 = US$20.48 to copy, our arithmetic. That is 22.2% of the US$92.16 to send the same 1,024 GB from Virginia to the internet.

Inside one Amazon region the file carries two lines and does not say which packets hit which. Usage type DataTransfer-Regional-Bytes is US$0.010 per GB, described as regional transfer in, out or between EC2 availability zones. Usage type USE1-DataTransfer-xAZ-Out-Bytes is US$0.000 per GB, and its description also mentions traffic between availability zones. We do not pick one. On this file, “same region” is not one price.

Google prices a different zone in the same region at US$0.01 per GiB, and same-zone traffic on internal addresses at no charge. It also says traffic to or from an external IPv4 address leaves the zone. Azure prices one availability zone at zero, regions in North America or Europe at US$0.02 per GB, and regions in Asia at US$0.08 per GB.

## Why does the meter bind?

Because the charge sits on the provider the byte is leaving, and a live service keeps leaving.

Serving the same 1,024 GB from Singapore, after copying it from Virginia, is two Amazon lines: US$20.48 to copy, then US$122.88 to leave Singapore for the internet, US$143.36 in all, against US$92.16 served from Virginia, our arithmetic.

A full exit is the exception, and it has conditions. Amazon offers free data transfer out when an eligible customer moves all of its data off AWS or off one service. Azure offers free internet egress for a customer who is leaving, and says anything above 100 GB is claimed as a credit. A service that stays keeps the ordinary meter. The token is a different unit from the gigabyte: [AI tokens](https://www.sotkn.com/explained/ai-tokens-explained/).

## Who gets paid — and where is the stuck step?

Our read: the source hyperscaler is paid on the outbound gigabyte. The destination is not paid for the arrival. The network in the middle of the public internet is not a line on these cards.

- **The source cloud, per gigabyte out.** On these cards that is AWS, Azure or Google. Who the three companies are is [who the hyperscalers are](https://www.sotkn.com/explained/who-are-the-hyperscalers/).
- **Not the destination, for the byte arriving.** Amazon prices inbound to Virginia and to Singapore at US$0.000 per GB. Azure and Google list inbound at no charge.
- **The same cloud again, if the byte changes region first.** Virginia to Oregon, Ireland or Singapore is US$0.020 per GB before any send to the internet.

The stuck step is that ordinary meter, not the farewell invoice. A waiver can zero the farewell. It does not zero bytes a live service keeps sending.

## What changes on 12 January 2027?

Article 29 of Regulation (EU) 2023/2854, the Data Act, sets the clocks. From 11 January 2024 to 12 January 2027, switching charges are allowed only up to costs directly linked to the switch. From 12 January 2027, a provider shall not impose any switching charges for the switching process. Standard service fees have to be disclosed separately.

Recital 88 gives egress during a switch — transit to another provider, or onto the customer’s own machines — as a switching charge. Recital 89 says that withdrawal specifically includes egress charges imposed on a customer, and that standard service fees for the service itself are not switching charges and are not withdrawn.

Our read: a farewell copy is the recital’s switching charge, and bytes a live service keeps sending look like a standard fee. The regulation does not sort them. Amazon will take a request for a reduced EU rate and does not print one. Azure’s free exit is a credit to claim. Google’s fetched page still prints the Premium Tier rates.

Moving the whole workload is a different contract. That choice is [on-premise versus cloud](https://www.sotkn.com/explained/on-premise-vs-cloud/), and the three companies are [AWS versus Azure versus Google Cloud](https://www.sotkn.com/explained/aws-vs-azure-vs-google-cloud/).

## What would change this view?

- **The cards move.** A republished tier moves the examples. The offer file is stamped 17 November 2026.
- **A regulator sorts the byte.** If ordinary user traffic is ruled a switching charge, the stuck step closes. If only the farewell copy is, the meter stays.
- **Inbound stops being zero.** A destination that charges arrival would split the money. None of the lines checked today does.

## Common misconceptions

- **People assume the charge is on the way in.** Actually the inbound lines we checked are zero. The charge is on the way out.
- **People assume one cloud has one egress price.** Actually Amazon’s first paid tier is US$0.090 in Northern Virginia and US$0.120 in Singapore, and the top tier is US$0.050 against US$0.080.
- **People assume traffic inside one region is free.** Actually Google prices another zone at US$0.01 per GiB, and Amazon’s file lists both US$0.010 and US$0.000 for regional bytes without saying which packet is which.
- **People assume a free exit, or the EU law, has already turned the meter off.** Actually Article 29 bans switching charges only from 12 January 2027, and the cards fetched that day still print outbound prices.

## FAQ

**What is cloud egress?**  
Cloud egress is data that leaves a cloud provider’s network, counted in gigabytes and billed on the way out. On the cards checked here, data coming in is free.

**How much does AWS charge to send data to the internet?**  
On the 17 November 2026 price list, Northern Virginia’s first paid tier is US$0.090 per GB up to 10,240 GB, then US$0.085, US$0.070 and US$0.050\. Singapore’s first tier is US$0.120\. The pricing page adds 100 GB free each month, except China and GovCloud.

**Is data transfer into AWS free?**  
Yes, on that list. Inbound from the internet to Northern Virginia and to Singapore is US$0.000 per GB. Azure and Google also list inbound at no charge on the pages fetched 17 November 2026.

**Why is egress from Singapore higher than from Virginia?**  
Amazon’s first paid tier is US$0.120 per GB in Singapore and US$0.090 in Northern Virginia, one third higher by our arithmetic. The next tier matches, at US$0.085\. Above 153,600 GB Singapore is US$0.080 and Virginia is US$0.050.

**Does leaving a cloud still cost money?**  
It can. Amazon waives data transfer out when an eligible customer moves all of its data off AWS or off one service. Azure waives internet egress for a customer who is leaving, with a credit to claim above 100 GB. A service that stays is outside those waivers.

**What changes on 12 January 2027?**  
Article 29 of the EU Data Act says providers shall not impose switching charges for the switching process from that date. Until then, those charges may not exceed costs directly linked to the switch. Recital 89 says standard service fees are not withdrawn.

**Is every egress gigabyte a switching charge?**  
The regulation does not say that. Recital 88 treats egress during a switch as a switching charge. Recital 89 says standard service fees are not switching charges. It does not sort every live-service byte into one box.

**Is this advice to buy or sell any company?**  
No. This page explains how outbound data is priced and who it pays. It does not rate companies as investments or give buy or sell calls. Not investment advice. Do your own research.

## Related terms

Related: [what a cloud region is](https://www.sotkn.com/explained/cloud-region-explained/); [region versus availability zone](https://www.sotkn.com/explained/region-vs-availability-zone/); [AI tokens](https://www.sotkn.com/explained/ai-tokens-explained/); [who the hyperscalers are](https://www.sotkn.com/explained/who-are-the-hyperscalers/); [on-premise versus cloud](https://www.sotkn.com/explained/on-premise-vs-cloud/).

## Markets and stack doors

Layer: [Hyperscalers](https://www.sotkn.com/stack/hyperscalers/). Virginia’s price is on the [US Markets door](https://www.sotkn.com/markets/us/). Singapore’s premium is on the [Singapore Markets door](https://www.sotkn.com/markets/singapore/).

[Get the Wire](https://www.sotkn.com/#/portal/signup), a free daily note on who pays for AI computing.

**How we check this**

Amazon’s tiers, the US$0.020 inter-region rate, the two regional usage types and the inbound zeros are from the AWS Data Transfer offer file published 17 November 2026 at 00:49 UTC. The 100 GB allowance, the all-data exit waiver and the EU request line are from the EC2 pricing page, fetched the same day. Azure’s rates, its 1 TB = 1,000 GB rule and its leaving credit are from Microsoft’s bandwidth page. Google’s Premium Tier rates, inbound and the inter-zone rate are from its VPC pricing page. Both pages were fetched 17 November 2026\. The clocks and the split between switching charges and standard fees are Article 29 and recitals 88 and 89 of Regulation (EU) 2023/2854\. Products of a rate and a quantity are our arithmetic. Who gets paid and the stuck step are our read. Not investment advice. Do your own research.

**Last reviewed:** 17 Nov 2026 · **Next review:** 12 January 2027, when EU Data Act Article 29 bans switching charges, or sooner if these tiers are republished

Spot an error? [Tell us](mailto:sean@thekopinotes.com) and we will correct it and note the change here.

[Our editorial standards →](https://www.sotkn.com/editorial-standards/)

## Sources

1. [Amazon Web Services — AWS Data Transfer offer file (publicationDate 2026-11-17T00:49:47Z)](https://pricing.us-east-1.amazonaws.com/offers/v1.0/aws/AWSDataTransfer/current/index.json?ref=sotkn.com) — Virginia and Singapore internet-out tiers, inbound at US$0.000, inter-region at US$0.020, and the two regional usage types
2. [Amazon Web Services — EC2 On-Demand pricing, data transfer (fetched 17 Nov 2026)](https://aws.amazon.com/ec2/pricing/on-demand/?ref=sotkn.com) — 100 GB free each month except China and GovCloud; the all-data exit waiver; EU customers may request reduced Data Act rates
3. [Microsoft Azure — Bandwidth pricing (fetched 17 Nov 2026)](https://azure.microsoft.com/en-us/pricing/details/bandwidth/?ref=sotkn.com) — Ingress and same-zone free; US$0.087 and US$0.12 internet tiers; 1 TB = 1,000 GB; leaving credit above 100 GB
4. [Google Cloud — VPC network pricing (fetched 17 Nov 2026)](https://cloud.google.com/vpc/network-pricing?ref=sotkn.com) — Premium Tier default; internet egress to North America; inbound free; US$0.01 per GiB between zones
5. [EUR-Lex — Regulation (EU) 2023/2854, Article 29 and recitals 88 and 89](https://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX:32023R2854&ref=sotkn.com) — Switching charges capped until 12 January 2027, then banned for the switch; standard service fees stay

S

[**Sean**](https://www.sotkn.com/author/sean/)

Writes Second Order by TKN — a plain-English map of AI infrastructure and semiconductors for non-specialist investors. Focus: who gets paid, where money sticks, and which step is stuck.

[Author page →](https://www.sotkn.com/author/sean/) · [Editorial standards →](https://www.sotkn.com/editorial-standards/)