> ## Content Index
> Fetch the complete content index at: https://www.sotkn.com/llms.txt
> Use this file to discover other available public pages before exploring further.

# TPU vs GPU: Google’s Chip, Nvidia’s Chip, and Who Gets Paid
- URL: https://www.sotkn.com/explained/tpu-vs-gpu/
- Published: 2026-10-08T01:24:26.000Z
- Updated: 2026-10-08T01:26:30.000Z
- Description: A TPU is a chip Google designs for AI matrix math only; a GPU is a general-purpose parallel chip. Different designers and builders get paid, but both chips wait for the same memory.
- Author: Sean
- Tags: Versus, #desk-explained

EXPLAINED · Versus · Last reviewed: 08 Oct 2026 · Next review: after Alphabet Q3 2026 results (28 Oct 2026)

TPU vs GPU: a TPU is a chip Google designs for AI matrix math only; a GPU is a general-purpose parallel chip that runs AI and much else.

**In short.** A TPU is Google’s own chip. Google designs it and Broadcom builds it. The GPUs it sells beside them come from Nvidia, which designs them and sells them, often as a whole rack. Google Cloud sells hours on both. The money paths differ, but the memory is the same: each chip carries about 180 to 280 GB of high-bandwidth memory. That memory is the stuck step. Nvidia’s supply commitments rose from $119 billion to $279 billion in one quarter, mostly for memory.

Why an investor cares: the chip choice decides who books the money, and at what margin. A GPU dollar goes to Nvidia. A TPU dollar is split: Broadcom is paid to build it, and Google keeps the design. For how a TPU works inside, see [what a TPU is](https://www.sotkn.com/explained/tpu-explained/).

## What is the difference between a TPU and a GPU?

Focus. A TPU does one job, the large matrix math that trains and runs AI models. A GPU does many kinds of parallel work, and AI is now its biggest use.

Google Cloud calls the TPU a custom application-specific integrated circuit, or ASIC. Google designs it. Broadcom develops and supplies it. A GPU is designed by a chip company such as Nvidia, which sells the chip, or a full rack with its own CPUs and networking.

|                                 | TPU                                                                          | GPU                                                                                 |
| ------------------------------- | ---------------------------------------------------------------------------- | ----------------------------------------------------------------------------------- |
| What it is                      | An ASIC built for the matrix math in AI                                      | A general-purpose parallel chip, used for AI and much else                          |
| Who designs it                  | Google                                                                       | Nvidia (also AMD and others)                                                        |
| Who builds it                   | Broadcom, paid on shipment under a long-term supply agreement                | Nvidia, paid when it ships the GPU or a whole rack system                           |
| Memory per chip on Google Cloud | 192 GiB HBM per Ironwood (≈206 GB)                                           | 180 GB (B200), 186 GB (GB200), 279 GB (GB300), all HBM3e                            |
| Where you can use it            | Google Cloud by the hour; since Q2 2026, TPU systems in your own data centre | Bought outright, or by the hour at most clouds and neoclouds, Google Cloud included |
| Best fit, per Google Cloud      | Models dominated by matrix math, large batches, training for weeks or months | Models with many custom operations that must run partly on CPUs                     |

*Sources: Google Cloud documentation (2 and 6 Oct 2026); Broadcom and Nvidia results calls. GPU memory per chip = machine HBM ÷ GPU count; 192 GiB ≈ 206 GB, our arithmetic.*

## Is a TPU better than a GPU?

It depends on the work. Google Cloud’s guide sends models dominated by matrix math, with large batches and long training runs, to TPUs. It sends models with many custom operations that must run partly on CPUs to GPUs.

Each side also makes its own claim. Broadcom said on 2 September 2026 that the new TPU v8i is comparable to, if not better than, Nvidia’s Vera Rubin GPU, and that custom chips run at “less than half the cost” of a GPU. Nvidia said on 26 August 2026 that such chips are built “for one cloud or one service,” while its GPUs run every model and are “in every cloud.” These are company claims. Our sources hold no independent test.

## Is a TPU cheaper than a GPU?

Per chip, on Google Cloud’s price list, yes. On a 3-year commitment an Ironwood TPU costs $5.40 an hour. An Nvidia B200 costs about $7.09 an hour, worked out from an 8-GPU machine.

| Google Cloud list price, us-central1 | Ironwood TPU, per chip-hour | Nvidia B200, per GPU-hour |
| ------------------------------------ | --------------------------- | ------------------------- |
| On demand                            | $12.00                      | Not offered               |
| Flex-start                           | $6.00                       | $8.06 ($64.44 ÷ 8)        |
| 3-year commitment                    | $5.40                       | $7.09 ($56.71 ÷ 8)        |

*Source: Google Cloud TPU pricing and accelerator-optimized VM pricing, checked 8 Oct 2026\. The B200 price is for an 8-GPU a4-highgpu-8g machine, which includes 224 vCPUs, 3,968 GB of memory and local SSD; per-GPU figures are our arithmetic. A price per chip is not a price per unit of work.*

A chip-hour is not a unit of work, and the GPU machine price also covers CPUs, memory and disks. The fair test is cost per finished job.

## Who gets paid: TPU vs GPU

Different companies are paid at each step.

| Step                                                | TPU path                                                                          | GPU path                                                                             |
| --------------------------------------------------- | --------------------------------------------------------------------------------- | ------------------------------------------------------------------------------------ |
| Designs the chip                                    | Google                                                                            | Nvidia                                                                               |
| Paid on shipment                                    | Broadcom: AI chip revenue $16.7B, quarter to 2 Aug 2026; custom chips 73%         | Nvidia: Data Center revenue $89.0B, quarter to 26 Jul 2026; $48.7B from hyperscalers |
| Chip maker’s take per gigawatt (company statements) | Broadcom: $20–30B of its content                                                  | Nvidia: about $40B with Vera Rubin, up from about $25B with Blackwell                |
| Buys the memory                                     | Broadcom: says memory content is diluting its gross margin                        | Nvidia: commitments $279B, mainly memory                                             |
| Gross margin                                        | Broadcom (whole company): guided about 73% for Q4 FY2026, from 78% a year earlier | Nvidia: 75.0% in Q2; guided 74% for Q3; expects a 71–72% low in Q4                   |
| Sells the hours                                     | Google Cloud only                                                                 | Google Cloud and other clouds                                                        |

*Sources: Broadcom Q3 FY2026 call (2 Sep 2026); NVIDIA CFO commentary and call (26 Aug 2026); Alphabet Q2 2026 call (22 Jul 2026).*

Nvidia books the most per chip. Its Data Center revenue was $89.0 billion in the quarter to 26 July 2026, with $48.7 billion, about 55%, from hyperscalers (48.7 ÷ 89.0, our arithmetic). Broadcom’s AI chip revenue was $16.7 billion in the quarter to 2 August 2026\. Custom chips like the TPU were 73% of that, about $12.2 billion (our arithmetic), across six customers, not only Google. For the full map of roles, see [who makes AI chips](https://www.sotkn.com/explained/who-makes-ai-chips/).

Per gigawatt of data centre, Nvidia said it takes about $40 billion with Vera Rubin. Broadcom said its content is $20 billion to $30 billion per gigawatt. Both are statements on results calls, not audited figures.

![TPU vs GPU — who gets paid and the stuck step: Nvidia, Broadcom, memory makers and Google Cloud](https://storage.ghost.io/c/cd/10/cd10e222-131f-4ba4-b4a9-ca4214e8c12d/content/images/2026/10/tpu-vs-gpu-infographic.png)

Stuck step: both chips need the same high-bandwidth memory. Sources: NVIDIA, Broadcom, Alphabet results calls, Jul–Sep 2026.

## Why does Google sell both TPUs and GPUs?

Because its customers ask for both. Alphabet said on 22 July 2026 that it offers “the industry’s broadest range of accelerators from Google and NVIDIA,” including Nvidia’s Vera Rubin and its own TPU 8t and 8i. Its software runs across both, and Google uses both to serve its own models.

That makes Google both a buyer and a seller. It buys GPUs from Nvidia and pays Broadcom for TPUs. Its capex was $44.9 billion in Q2 2026, mostly on technical infrastructure, and about 60% of that on servers. It earns back when hours are used: Google Cloud revenue rose 82% to $24.8 billion. Since Q2 it also sells whole TPU systems into customers’ own data centres, with most of that revenue expected in 2027\. See [what a hyperscaler is](https://www.sotkn.com/explained/hyperscaler-explained/) and [how accelerator hours are sold](https://www.sotkn.com/explained/gpu-as-a-service-explained/).

## Where is the stuck step for TPUs and GPUs?

Memory. Both chips carry high-bandwidth memory (HBM) on the package, and the amounts are close. On Google Cloud, an Nvidia B200 has 180 GB and a GB300 has 279 GB. An Ironwood TPU has 192 GiB, about 206 GB.

![TPU vs GPU — HBM memory per chip on Google Cloud for Nvidia B200, GB200, GB300 and Google Ironwood TPU](https://storage.ghost.io/c/cd/10/cd10e222-131f-4ba4-b4a9-ca4214e8c12d/content/images/2026/10/tpu-vs-gpu-hbm-chart.png)

HBM per chip on Google Cloud: B200 180 GB, GB200 186 GB, Ironwood ≈206 GB, GB300 279 GB. Source: Google Cloud documentation, Oct 2026.

Both chip makers say memory is the pinch. Nvidia’s supply commitments rose from $119 billion to $279 billion in one quarter, “primarily related to the procurement of memory.” It called memory prices “extreme” and said they are “headed even higher into next year.” Broadcom said the rising memory on its custom chips is diluting its gross margin, and named HBM among the inputs that can each become the bottleneck. For who makes it, see [who makes HBM](https://www.sotkn.com/explained/who-makes-hbm/) and [HBM, explained](https://www.sotkn.com/explained/hbm-explained/).

So the memory makers are paid either way. Picking a TPU over a GPU changes who books the chip revenue. It does not shorten the memory queue. For what memory prices look like now, see [Samsung’s 2027 HBM4 ask](https://www.sotkn.com/markets/korea/korea-samsung-hbm4-ask-october-2026/). After memory, the next wait is the powered hall; see [where the stuck step moves next](https://www.sotkn.com/analysis/where-does-the-stuck-step-move/).

## What to check next

Three dated checks. 28 October 2026 (US time): Alphabet’s Q3 results, for TPU-system revenue and capex. 17 November 2026: Nvidia’s Q3 fiscal 2027 results, the date it gave on its last call, against its $108 billion revenue guide and 74% margin. 9 December 2026: Broadcom’s Q4 results, against its $21.7 billion AI revenue guide. In each, watch what they say about memory costs.

## Common misconceptions

- **People assume a TPU is Google’s version of a GPU.** Actually it is an ASIC built for matrix math. Google’s own guide still sends some work to GPUs.
- **People assume Google uses only its own chips.** Actually Google Cloud sells Nvidia GPU hours too, including Vera Rubin, and uses both chips itself.
- **People assume a cheaper chip-hour means cheaper AI.** Actually the fair test is cost per finished job. A chip-hour price says nothing about speed.
- **People assume choosing TPUs avoids the memory squeeze.** Actually both chips carry HBM. Broadcom says memory is diluting its margin too.

## FAQ

**What is the difference between a TPU and a GPU?**  
A TPU is a chip Google designs for one job, the matrix math in AI. A GPU is a general-purpose parallel chip that runs AI and much else. Both carry high-bandwidth memory (HBM) next to the compute.

**Is a TPU better than a GPU?**  
It depends on the work. Google Cloud’s own guide points models dominated by matrix math, with large batches, that train for weeks or months, to TPUs. It points models with many custom operations that must run partly on CPUs to GPUs.

**Is a TPU cheaper than a GPU?**  
Per chip, on Google Cloud’s list, yes. On 8 October 2026 an Ironwood TPU cost $5.40 per chip-hour on a 3-year commitment, against about $7.09 per GPU-hour for an Nvidia B200 machine. That is a price per chip, not per unit of work.

**Who makes TPUs and GPUs?**  
Google designs TPUs and Broadcom develops and supplies them. Nvidia designs its GPUs and sells them, often as whole rack systems with its own CPUs and networking.

**Is this a list of stocks to buy or sell?**  
No. Second Order Explained pages explain who does what and how the money moves. They do not give buy or sell calls.

## Related terms

- [TPU](https://www.sotkn.com/explained/tpu-explained/) — how Google’s chip works and who builds it.
- [HBM](https://www.sotkn.com/explained/hbm-explained/) — the stacked memory on both chips.
- [GPU as a service](https://www.sotkn.com/explained/gpu-as-a-service-explained/) — how accelerator hours are sold.
- [Neocloud vs hyperscaler](https://www.sotkn.com/explained/neocloud-vs-hyperscaler/) — who else sells GPU hours.

## Stack doors

Layers: [Hyperscalers](https://www.sotkn.com/stack/hyperscalers/) and [Semiconductors](https://www.sotkn.com/stack/semiconductors/). Wire: [Micron’s 2027 memory commitments](https://www.sotkn.com/wire/micron-locks-75-pct-2027-memory-output-wire/).

[Get the Wire](https://www.sotkn.com/#/portal/signup) — short daily notes when chip shipments, memory prices or compute contracts move.

**How we check this**

Figures come from company filings, results calls and Google Cloud’s own documentation and price lists, each dated in the list below. Claims a company makes about its own chip, such as speed or cost against a rival, are labelled as that company’s claim. Where we work something out ourselves, like memory per GPU or a per-GPU price, the arithmetic is shown in full. This page explains how the money moves. It does not give buy or sell calls.

**Last reviewed:** 08 Oct 2026 · **Next review:** after Alphabet Q3 2026 results (28 Oct 2026)

Spot an error? [Tell us](mailto:sean@thekopinotes.com) and we will correct it and note the change here.

[Our editorial standards →](https://www.sotkn.com/editorial-standards/)

## Sources

- [Google Cloud documentation — TPU7x (Ironwood), HBM per chip (last updated 2 Oct 2026)](https://docs.cloud.google.com/tpu/docs/tpu7x?ref=sotkn.com)
- [Google Cloud documentation — Introduction to Cloud TPU, when to use GPUs or TPUs (last updated 2 Oct 2026)](https://docs.cloud.google.com/tpu/docs/intro-to-tpu?ref=sotkn.com)
- [Google Cloud documentation — Accelerator-optimized machines, GPU memory for A4X Max, A4X and A4 (last updated 6 Oct 2026)](https://docs.cloud.google.com/compute/docs/accelerator-optimized-machines?ref=sotkn.com)
- [Google Cloud — Cloud TPU pricing, us-central1 (checked 8 Oct 2026)](https://cloud.google.com/tpu/pricing?ref=sotkn.com)
- [Google Cloud — Accelerator-optimized VM pricing, a4-highgpu-8g, us-central1 (checked 8 Oct 2026)](https://cloud.google.com/products/compute/pricing/accelerator-optimized?ref=sotkn.com)
- [Alphabet Q2 2026 earnings call transcript (22 Jul 2026)](https://abc.xyz/investor/events/event-details/2026/2026-Q2-Earnings-Call-2026-GgTAq7Is0z/default.aspx?ref=sotkn.com)
- [NVIDIA CFO Commentary on Q2 fiscal 2027 results, SEC filing (26 Aug 2026)](https://www.sec.gov/Archives/edgar/data/1045810/000104581026000073/q2fy27cfocommentary.htm?ref=sotkn.com)
- [NVIDIA Q2 fiscal 2027 earnings call transcript (26 Aug 2026)](https://s201.q4cdn.com/141608511/files/content%5Ffiles/TRANSCRIPT%5F-NVIDIA-Corp-NVDA-US-Q2-2027-Earnings-Call-26-August-2026-5%5F00-PM-ET.pdf?ref=sotkn.com)
- [Broadcom Q3 FY2026 earnings call transcript (2 Sep 2026)](https://stockanalysis.com/stocks/avgo/transcripts/685349-q3-2026/?ref=sotkn.com)

S

**[Sean](https://www.sotkn.com/author/sean/)**

Writes Second Order by TKN — a plain-English map of AI infrastructure and semiconductors for non-specialist investors. Focus: who gets paid, where money sticks, and which step is stuck.

Covers AI infrastructure, semiconductors, and second-order stack reads.

[Author page →](https://www.sotkn.com/author/sean/) · [Editorial standards →](https://www.sotkn.com/editorial-standards/)