> ## Content Index
> Fetch the complete content index at: https://www.sotkn.com/llms.txt
> Use this file to discover other available public pages before exploring further.

# What Does Amkor Do? The Invoice Before the 2.5D Line
- URL: https://www.sotkn.com/stack/semiconductors/cowos/what-does-amkor-do/
- Published: 2026-11-16T04:50:45.000Z
- Updated: 2026-11-16T04:50:45.000Z
- Description: Amkor gets paid when another company's chip is packaged and shipped, and in the quarter ended 30 September 2026 that invoice was $1,990.6 million, only $3.6 million more than a year earlier, while two 2.5D programs on its own slide were still waiting to ramp.
- Author: Sean
- Tags: #layer-cowos

Amkor gets paid when another company's chip is packaged and shipped, and in the quarter ended 30 September 2026 that invoice was $1,990.6 million, only $3.6 million more than a year earlier, while two 2.5D programs on its own slide were still waiting to ramp.

Amkor is the largest U.S.-headquartered outsourced assembly and test company. The mechanism is [CoWoS, explained](https://www.sotkn.com/explained/cowos-explained/). The listed-company door is [U.S. markets](https://www.sotkn.com/markets/us/). The capacity note is the [Wire on the NVIDIA supplier cheques](https://www.sotkn.com/wire/nvidia-1-1bn-kyec-amkor-3bn-substrate-capacity-wire/). Education only. Figures are the Form 10-Q filed 27 October 2026, the 26 October release, and that day's slides, unless a line says our arithmetic.

## Numbers that matter

Quarter ended 30 September 2026\. The income statement is unaudited. The release is dated 26 October 2026 and the Form 10-Q was filed the next day. Dollars below are the filing's thousands, written in millions.

| Print                              | Figure                            | Where it sits                                                                                                              |
| ---------------------------------- | --------------------------------- | -------------------------------------------------------------------------------------------------------------------------- |
| Net sales                          | $1,990.6 million                  | +$3.6 million, +0.2% vs a year earlier. The release rounds this to $1.99 billion.                                          |
| Gross profit                       | $363.5 million                    | 18.3% margin, from 14.3%. Up $79.0 million.                                                                                |
| Operating income                   | $224.7 million                    | 11.3% margin, from 8.0%.                                                                                                   |
| Net income                         | $190.9 million                    | Attributable to Amkor $190.6 million. Diluted EPS $0.76.                                                                   |
| Advanced products                  | $1,631.6 million                  | 82.0% of sales. Down $51.9 million, 3.1%, from a year earlier.                                                             |
| Mainstream products                | $359.0 million                    | Up $55.5 million, 18.3%. Wirebond and its test.                                                                            |
| Computing                          | 26% of sales                      | Was 19%. Filing: +37% year on year, on datacenter. Slide: +25% sequentially, a record.                                     |
| Communications                     | 37% of sales                      | Was 51%. Filing: −28%, as SiP programs moved from Korea factories to Vietnam.                                              |
| Materials in cost of sales         | $1,009.3 million                  | 50.7% of sales, from 57.5%. Down $132.9 million.                                                                           |
| Capital spending, Q3 / nine months | $548.4 million / $1,236.8 million | The quarter's spend is 27.5% of sales. Nine-month operating cash was $868.3 million.                                       |
| Cash and short-term investments    | $2,376.2 million                  | Slide: $2.4 billion. Debt the same day $2,467.2 million. Slide: $2.5 billion.                                              |
| Contract liabilities               | $547.6 million                    | Was $390.8 million at 31 December 2025\. Short-term piece $127.5 million.                                                  |
| Advances still expected            | About $1.9 billion                | Over the next 12 months. A separate October agreement is about $1.3 billion in 2027\. The filing does not say to add them. |
| Arizona costs incurred             | $553.3 million                    | Includes $8.5 million of capitalised interest. Phase 2 groundbreaking is late 2027.                                        |
| Q4 sales guide                     | $1.9–2.0 billion                  | Gross margin 18.0–19.0%. Net income $160–185 million. Full-year capital spending about $2.5 billion.                       |

Advanced and mainstream add back to sales: $1,631.580 million + $358.977 million = $1,990.557 million. Gross margin on those thousands is 18.26%, printed as 18.3%. Operating margin is 11.29%, printed as 11.3%. The release's EBITDA of $435 million is 191 + 18 + 39 + 187\. The unrounded income statement, interest, tax, and segment depreciation sum to $434.640 million. The $0.4 million is that rounding.

On the rounded shares, computing is about $517.5 million, up 37.1% against the MD&A's 37%. Communications is about $736.5 million, down 27.3% against the MD&A's 28%. Automotive is about $437.9 million, up 37.7% against 37%. Rebuilding the slide's sequential rates from second-quarter sales of $1,898 million and the rounded shares gives about +24%, −7.6%, +5%, and +12% for computing, communications, automotive, and consumer, against the slide's +25%, −8%, +7%, and +10%. Both automotive quarters print as 22%, so the slide's +7% is in the unrounded dollars.

## What does it actually do?

Amkor takes a wafer someone else has printed and returns a package that can go on a board. The Form 10-Q lists the turnkey steps as package design, wafer bump, probe, back-grind, packaging, burn-in, system-level test, final test, and drop shipment. The named technologies are high-density fan-out (HDFO), 2.5D, advanced flip chip, fine-pitch bumping, wafer-level processing, and system-in-package.

| Step          | What happens                                                                                               | Where this quarter's money sat                                                                                            |
| ------------- | ---------------------------------------------------------------------------------------------------------- | ------------------------------------------------------------------------------------------------------------------------- |
| Receive       | A foundry wafer or a memory device arrives for bump, grind, and assembly.                                  | Amkor does not book the wafer sale. That invoice stays with the foundry or the memory maker.                              |
| Join          | HDFO, flip chip, or a 2.5D build puts the die, and where the design needs it the memory, onto a substrate. | The slide says the flagship HDFO CPU program was scaling. Two 2.5D programs were ramping into the fourth quarter.         |
| Ship and test | The package leaves after test.                                                                             | The release puts packaging at 88% of sales and test at 12%, the same split as the prior quarter and the year-ago quarter. |

That 2.5D step sits beside the join [TSMC sells as CoWoS](https://www.sotkn.com/stack/semiconductors/cowos/what-does-tsmc-do/). The [advanced-packaging players page](https://www.sotkn.com/explained/who-makes-advanced-packaging/) separates the outsourced lane from TSMC's captive one. Amkor's HDFO CPU program was already scaling. The two 2.5D programs were not yet this invoice. The filing says much of factory cost is fixed, and that capital spending is generally made ahead of revenue and without firm customer commitments. This 10-Q prints no backlog. A slide program is a plan. Net sales are packages that shipped.

## How does it make money?

It bills for the package and the test after the work ships. Advanced products, the filing's name for flip chip, memory, wafer-level processing, and related test, were $1,631.6 million, 82.0% of sales, and $51.9 million lower than a year earlier. Mainstream wirebond rose $55.5 million to $359.0 million. −$51.925 million + $55.514 million = the +$3.589 million sales change. Phone packages sit inside "advanced," so that line falling while computing's share rose from 19% to 26%, and communications fell from 51% to 37%, is a mix shift inside one family.

Gross profit rose $79.0 million on a sales increase of $3.6 million. The MD&A credits a higher share of products with lower material content. Materials fell $132.9 million, from $1,142.2 million to $1,009.3 million. The filing also says advanced packaging tends to carry higher material cost, so the margin is the mix: communications fell on the Korea-to-Vietnam SiP transfer, and the slide adds constrained materials, while computing and automotive each grew 37% on datacenter and ADAS.

Operating income was $224.7 million after $99.0 million of overhead and $39.8 million of research, down 6.0% as projects moved into production. The slide names the live one: HDFO CPU was scaling, with a further HDFO program and two 2.5D programs ramping in the fourth quarter. Interest expense was $17.9 million, lower because more was capitalised into Arizona, against interest income of $22.7 million. Attributable earnings were $190.6 million, up from $126.6 million. Nine-month dividends were $62.1 million. The 22 September dividend of $0.08352 on 248.015 million basic shares is $20.7 million. The April buyback, capped at $300.0 million, has used $32.3 million for 0.7 million shares ($46.14 on our division), leaving $267.7 million. The release puts about $32 million of that in the quarter.

## What limits it?

The limit is the line that has not shipped. Cash and short-term investments of $2,376.2 million sit $91.0 million under debt of $2,467.2 million, with $1.0 billion still undrawn on the revolver and $62.1 million of foreign term-loan room. Those three sum to $3,438.3 million, the slide's $3.4 billion of liquidity. $1,356.5 million of the cash and investments, 57%, sits offshore. That pile is not a fourth-quarter 2.5D shipment.

Fourth-quarter sales guidance is $1.9 billion to $2.0 billion. The midpoint, $1.95 billion, is $40.6 million, or 2.0%, under this quarter. Guided net income of $160 million to $185 million midpoints at $172.5 million, $18.4 million under this quarter's $190.9 million. The guide does not split end markets, so the 2.5D ramp is still a slide date rather than a computing dollar.

Contract liabilities were $547.6 million, up $156.8 million from $390.8 million at year-end 2025\. The short-term piece, $127.5 million, matches deferred revenue of $127.452 million. The filing expects $406.3 million of the rest over one to five years and $13.9 million over five to ten years. Those sum to $420.2 million, against $547.6 million minus $127.5 million = $420.1 million. The $0.1 million is rounding. Only $46.3 million of the 1 January balance became revenue in nine months, 11.8% of $390.8 million.

Ahead of that balance, the company expected about $1.9 billion of advances over the next 12 months, $200 million of which will need a letter of credit on receipt. Another $200.0 million of letters of credit was already out against advances in hand. Those are two different amounts. In October it signed a further agreement for about $1.3 billion in 2027\. The 10-Q names no customer and does not say whether the $1.3 billion sits inside the $1.9 billion. We do not add them. The [Wire](https://www.sotkn.com/wire/nvidia-1-1bn-kyec-amkor-3bn-substrate-capacity-wire/) covers a $1.3 billion Korea agreement Amkor described with NVIDIA on 21 October. Same month, same round number, unnamed in the filing. The sentences stay side by side.

Nine-month capital spending of $1,236.8 million against operating cash of $868.3 million leaves a $368.5 million gap, funded in part by the $1.15 billion of notes due 2031 issued in May 2026\. Capital-spending payable was $496.1 million. Taking the full-year guide of about $2.5 billion as $2,500 million, $1,263.2 million is still to be spent in the fourth quarter. Purchase obligations were $2,687.6 million, with $2,635.3 million due inside 12 months. That is $259.1 million more than cash and short-term investments, and it mixes tools, supply contracts, and other commitments.

Arizona costs incurred were $553.3 million, including $8.5 million of capitalised interest, after construction began in the second half of 2025\. The 8 September 2026 release sets phase 1 at 33,000 square metres, phase 2 at a further 60,000, and the campus at about 93,000\. Our check is 33,000 + 60,000 = 93,000\. Planned investment is about $12 billion, so $553.3 million is 4.6% of the stated campus. Phase 2 groundbreaking is late 2027, with completion by the end of 2029\. A May 2026 land contract, about 67 acres for about $33 million, was expected to close in the fourth quarter. The December 2024 CHIPS award of up to $407 million had paid nothing by 30 September. A July 2026 Korea support agreement offers up to about ₩150 billion, about $110 million. ₩15 billion, about $11 million, had arrived and sits in restricted cash and other non-current liabilities, with property pledged. That receipt is not revenue.

## Who else does this?

Roles on the same join, not a ranking.

| Company                                                                           | What it sells                                                       | What is different in the latest print                                                                  |
| --------------------------------------------------------------------------------- | ------------------------------------------------------------------- | ------------------------------------------------------------------------------------------------------ |
| Amkor                                                                             | Outsourced bump, assembly, and test, including HDFO and 2.5D.       | Sales $1,990.6 million, +0.2%. Advanced dollars down. Two 2.5D programs dated to the fourth quarter.   |
| [TSMC](https://www.sotkn.com/stack/semiconductors/cowos/what-does-tsmc-do/)       | Prints the die and runs captive CoWoS.                              | The attach slot many leading accelerators are built for. Amkor is an outsourced path beside that line. |
| [ASE](https://www.sotkn.com/stack/semiconductors/what-does-ase-do/)               | The other large outsourced packaging and test book, including SPIL. | Same lane, different factories and a different customer mix. This page does not restate ASE's figures. |
| [SK hynix](https://www.sotkn.com/stack/semiconductors/hbm/what-does-sk-hynix-do/) | The HBM stacks that sit in a 2.5D package.                          | A neighbour. A late stack holds Amkor's slot. A late slot holds the stack.                             |

Top-ten customers were 66% of sales, down from 73% a year earlier, on the release. The 10-Q does not name them.

## What would change this view?

The read weakens if a later filing shows any of these:

- Fourth-quarter computing dollars rise because the two 2.5D programs shipped in volume.
- Contract liabilities convert faster than $46.3 million across a comparable stretch.
- The next 10-Q names the customer on the $1.3 billion October agreement and places it inside or beside the $1.9 billion.
- Arizona phase 2 moves off late 2027, or the $407 million CHIPS award pays cash.
- The 18.3% gross margin shows up without a lower material share, or TSMC's packaging language loosens so customers stop prepaying merchant 2.5D.

It stays intact while sales sit near $2 billion, the 2.5D programs stay dated ahead, and capital spending stays ahead of operating cash.

## Practical takeaways

- Packaging was 88% of the quarter and test was 12%. The invoice was $1,990.6 million, up 0.2%, at an 18.3% gross margin.
- Advanced-product dollars fell $51.9 million while computing's share rose from 19% to 26%. The filing's computing growth of 37% is an end-market line, not the advanced-products line.
- The stuck step is the fourth-quarter 2.5D ramp, and Arizona phase 2 in late 2027\. Cash of $2,376.2 million is not that step.
- Only $46.3 million of opening contract liabilities became revenue in nine months, against about $1.9 billion of advances still expected.
- Nine-month capital spending ran $368.5 million ahead of operating cash. The next read is the fourth-quarter release.

## FAQ

**What does Amkor do?** Amkor packages and tests chips that other companies design. The work runs from bump and assembly through final test and drop shipment, and includes HDFO and 2.5D alongside flip chip and system-in-package.

**What does Amkor do in simple terms?** It puts the finished chip into the package that can be soldered onto a board, and it tests that package before it ships. The wafer was printed somewhere else.

**Is Amkor profitable?** Yes, on the reported quarter. Operating income was $224.7 million, an 11.3% margin, and gross margin was 18.3%. Attributable net income was $190.6 million, or $0.76 a diluted share. Nine-month operating cash was still $368.5 million short of capital spending.

**How is Amkor different from TSMC?** TSMC prints the wafer and packages many leading accelerators on its own CoWoS line. Amkor assembles and tests on an outsourced line, and its two 2.5D programs were still a fourth-quarter ramp on the 26 October slide. See [What Does TSMC Do?](https://www.sotkn.com/stack/semiconductors/cowos/what-does-tsmc-do/)

**Why was quarterly sales almost flat?** Sales rose $3.6 million, or 0.2%. Computing and automotive each grew 37% year on year, and communications fell 28% because system-in-package programs were moving from Korea to Vietnam. Advanced-product dollars fell $51.9 million. Mainstream wirebond rose $55.5 million and covered that gap.

**Should I buy Amkor shares?** We do not make buy or sell calls, and nothing here is a recommendation. What we can tell you is what the company does, how it gets paid, and which later filing would change the picture. The decision is yours.

## Keep reading on the map

- Mechanism: [What is CoWoS?](https://www.sotkn.com/explained/cowos-explained/) and [who makes advanced packaging](https://www.sotkn.com/explained/who-makes-advanced-packaging/).
- Markets door: [United States](https://www.sotkn.com/markets/us/), where Amkor is listed and where the Arizona campus is the long clock.
- Wire: [NVIDIA's 21 October supplier cheques](https://www.sotkn.com/wire/nvidia-1-1bn-kyec-amkor-3bn-substrate-capacity-wire/), including the Amkor Korea agreement. The 10-Q's October advance does not name the customer.
- Stack neighbours: [TSMC's CoWoS model](https://www.sotkn.com/stack/semiconductors/cowos/what-does-tsmc-do/), [ASE](https://www.sotkn.com/stack/semiconductors/what-does-ase-do/), and [SK hynix](https://www.sotkn.com/stack/semiconductors/hbm/what-does-sk-hynix-do/).
- This folder: [CoWoS on the Stack](https://www.sotkn.com/stack/semiconductors/cowos/).

## How we check this

Figures come from the Form 10-Q filed 27 October 2026, the 26 October release, and the same day's slides. Arizona's cleanroom sizes, the $12 billion, and the late-2027 groundbreaking are the 8 September 2026 release. Sequential rates are the slide's. Rounded shares do not recover them exactly, and that gap is stated above. Slide trailing EBITDA is $1,487 million. Debt of $2,467.2 million divided by that figure is 1.66, which the slide rounds to 1.7\. We cannot rebuild the trailing number from this 10-Q. There is no quarterly cash-flow statement, so the cash gap is a nine-month figure. No number here comes from a secondhand transcript.

Last reviewed: 16 November 2026\. Next review: after the fourth-quarter release. [Editorial standards](https://www.sotkn.com/editorial-standards/).

## Sources

1. [Amkor, Form 10-Q, quarter ended 30 September 2026](https://www.sec.gov/Archives/edgar/data/1047127/000104712726000052/amkr-20260930.htm?ref=sotkn.com), filed 27 October 2026\. Sales, mix, cash, debt, advances, Arizona costs, CHIPS, the Korea grant.
2. [Amkor earnings release, 26 October 2026](https://ir.amkor.com/news-releases/news-release-details/amkor-technology-reports-financial-results-third-quarter-2026?ref=sotkn.com). Packaging 88% and test 12%, top-ten customers 66%, EBITDA, the dividend, the buyback, and the fourth-quarter guide.
3. [Amkor Q3 2026 slides, 26 October 2026](https://ir.amkor.com/static-files/0ef4c21c-9b2a-4c22-be53-4fd891d17aa0?ref=sotkn.com). HDFO scaling, two 2.5D programs in the fourth quarter, sequential rates, liquidity of $3.4 billion.
4. [Amkor Arizona phase 2 release, 8 September 2026](https://ir.amkor.com/news-releases/news-release-details/amkor-technology-announces-phase-2-arizona-advanced-packaging?ref=sotkn.com). Cleanroom sizes, about $12 billion, groundbreaking late 2027.