> ## Content Index
> Fetch the complete content index at: https://www.sotkn.com/llms.txt
> Use this file to discover other available public pages before exploring further.

# What Does Disco Do? The Saw After Shipment
- URL: https://www.sotkn.com/stack/semiconductors/what-does-disco-do/
- Published: 2026-11-25T04:50:07.000Z
- Updated: 2026-11-25T04:50:07.000Z
- Description: Disco gets paid when a customer accepts a dicing saw or a grinder. In the quarter to 30 September 2026, shipments were ¥148,677 million and sales were ¥142,750 million.
- Author: Sean
- Tags: #layer-semiconductors

Disco gets paid when a customer accepts a dicing saw or a grinder. The machine can leave the factory on an earlier clock. In the quarter to 30 September 2026, shipments were a record ¥148,677 million and sales were ¥142,750 million. The company's own guide for the next quarter has that gap wider.

## Numbers that matter

July to September 2026\. Disco's English file calls the April 2026 year FY2026; the Japanese summary calls it the year ending March 2027\. Million yen, cut off below one million. The summary is Japanese GAAP, not an auditor's review, and Japanese prevails. Quarterly levels are the 22 October financial file. The half is that day's summary.

| Million yen          | Jul–Sep 2026 | Apr–Jun 2026 | Jul–Sep 2025 | Six months to 30 Sep 2026 |
| -------------------- | ------------ | ------------ | ------------ | ------------------------- |
| Shipments            | 148,677      | 135,906      | 96,351       | 284,584                   |
| Net sales            | 142,750      | 114,308      | 104,622      | 257,058                   |
| Gross profit         | 102,374      | 81,543       | 72,748       | 183,917                   |
| Gross margin         | 71.7%        | 71.3%        | 69.5%        | 71.5%                     |
| Operating income     | 67,606       | 49,033       | 44,391       | 116,639                   |
| Operating margin     | 47.4%        | 42.9%        | 42.4%        | 45.4%                     |
| Ordinary income      | 65,995       | 48,441       | 45,466       | 114,437                   |
| Net income to owners | 46,144       | 34,221       | 32,145       | 80,366                    |

Sales, gross profit and operating income in the two quarters add to the half exactly. Shipments, ordinary income and net income in the file add to ¥1 million less than the summary. We use the summary for the half and the file for each quarter. The presentation rounds the September shipment to ¥148.6 billion and calls it a record. 148,677 minus 142,750 is 5,927 (our arithmetic): shipments in the quarter that had not become sales.

That 5,927 is one quarter's flow, not a stock of unaccepted tools. Contract liabilities were ¥79,623 million at 30 September, against ¥50,006 million at 31 March, an increase of ¥29,617 million on those lines (our arithmetic). The cash-flow statement prints ¥29,872 million. The presentation says the liability includes payment on shipment. Those three figures are not the same pile.

The new cumulative forecast runs to 31 December: sales ¥389,500 million, operating income ¥174,700 million, ordinary income ¥173,400 million, net income to owners ¥121,900 million, shipments ¥434.2 billion. Subtracting the reported half (our arithmetic) leaves October-to-December sales of ¥132,442 million, operating income of ¥58,061 million and shipments of ¥149,616 million. The presentation rounds those to ¥132.4 billion, ¥58.1 billion and ¥149.6 billion, and prints an operating margin of 43.9%. Shipment minus sales in that guide is ¥17,174 million, against ¥5,927 million in the quarter just closed. The guide assumes ¥151 to the dollar. The September quarter averaged ¥159.4\. The presentation does not split the margin guide between the exchange rate, the mix and acceptance.

Cash and deposits were ¥342,411 million and cash equivalents ¥200,627 million. Investing cash flow was an outflow of ¥54,814 million, of which time deposits were ¥41,844 million and plant purchases ¥12,896 million. Operating cash flow was ¥111,708 million. Noncurrent liabilities were ¥994 million, and the summary prints no borrowings line.

## What does it actually do?

Disco makes the machines that cut and thin a wafer, plus the blades and wheels they use up. A dicing saw separates dies. A grinder thins the wafer first, so a memory stack can sit with a logic die. The foundry and the packaging house are other invoices. Disco is paid for the tool, then again for the consumable while the line runs.

On 23 July 2026 the company stated the rule for the April-to-June quarter: equipment sales are recorded when the customer inspects and accepts the machine. Acceptance that quarter arrived sooner than the April forecast, and sales and profit came in higher at every line. The 22 October summary uses the same clock. Equipment shipments were strong in high-value tools, consumable shipments stayed high with customer utilisation, and sales rose with progress on acceptance.

The summary names generative AI, data-centre investment, advanced logic and high-bandwidth memory, and prints no yen for any of them. On a shipment basis, dicer shipments rose for integrated-circuit work tied to generative AI, and for optical semiconductors and non-semiconductor optical parts tied to co-packaged optics. Grinder shipments stayed led by that same integrated-circuit work. No optics line has a yen value.

The file's application mix is also shipments, not the sales invoice. Of dicer shipments, integrated circuits were 73%, optical semiconductors 10%, non-semiconductors 10%, other semiconductors 5% and package singulation 3%. The lines add to 101 because each is rounded. Of grinder shipments, integrated circuits were 77%. Orders and order backlog are blank in the file. The clocks on the page are shipments, acceptance and contract liabilities.

## How does it make money?

Share of September-quarter sales, from the file: precision processing equipment 62%, consumable tools 24%, maintenance parts 10%, other 4%. Inside equipment, dicing saws including laser saws were 31% of sales, grinders and polishers 26%, accessory equipment 4%. Those inner lines are rounded and add to 61, not to 62.

The machine becomes sales at acceptance. The blade becomes sales as the customer's tools run. Maintenance parts, a tenth of sales, are the installed machine needing a spare. The presentation says consumable shipments rose sharply from the prior quarter, set a record, and that the gross margin on tools in particular helped the group margin. It does not print a separate tool margin.

Gross margin was 71.7%, against 69.5% a year earlier. Operating margin was 47.4%. The company attributes the higher gross margin to exchange rates and to more high-value products, which covered higher staff costs and research. Research expense was ¥9,833 million, against ¥8,070 million a year earlier. The half's foreign-exchange loss was ¥3,101 million, so half-year ordinary income of ¥114,437 million sits under operating income of ¥116,639 million. The quarter's ordinary income is ¥1,611 million under operating income (our arithmetic). The file does not label that quarterly gap as exchange rates alone.

On 22 October the board set an interim dividend of ¥186 a share, ¥20,182 million, from retained earnings. Record date 30 September 2026\. Payment 1 December 2026\. The policy target is 25% of half-year consolidated net income. ¥20,182 million is 25.1% of ¥80,366 million (our arithmetic). Issued shares 108,523,429 minus treasury 16,004 leaves 108,507,425 shares; at ¥186 that is ¥20,182,381,050, which the notice rounds to ¥20,182 million. A year-end rule can add about a third of surplus cash. This interim is presented as the 25% policy. The year-end dividend is undecided.

## What limits it?

The limit is acceptance. The factory can ship a record and the sales line still waits on the customer's inspection. This quarter that wait is the ¥5,927 million of shipments above sales, and contract liabilities of ¥79,623 million that include payment on shipment. The next quarter's guide has shipments at the ¥149,616 million implied above and sales at the ¥132,442 million implied above. The gap the company has published is already wider.

On a shipment basis, the presentation guides blade dicers down about 5%, laser saws flat, dicers slightly down, grinders up about 10%, accessory equipment up about 10%, equipment overall up about 5%, consumable tools down about 5% and other down about 10%. The line still guided up is the grinder. The consumable, which tracks utilisation, steps down from a record. Those percentages are not the sales forecast. Sales for the quarter are the cumulative guide.

The company guides one quarter ahead. The forecast notice says customers change investment plans too quickly for a longer call. No full-year sales figure is in these documents.

Cash is open: deposits ¥342,411 million, cash equivalents ¥200,627 million, and ¥41,844 million moved into time deposits during the half. File capital expenditure was ¥8,959 million this quarter and ¥3,351 million the quarter before, ¥12,310 million together (our arithmetic), against ¥12,896 million of cash spent on plant. The year is guided at about ¥33 billion of capital expenditure, ¥16 billion of depreciation and ¥38 billion of research. A separate slide puts a Haneda research building at about ¥14 billion and a Hiroshima plant at about ¥33 billion, paid from the company's FY2025 through FY2027 (April 2025 to March 2028). That Hiroshima total and this year's ¥33 billion forecast are the same size and are not the same line.

One charge is a building, not the saw. The half takes a ¥636 million impairment on a building at DISCO HI-TEC EUROPE GmbH in Bavaria, to be demolished for a new one. Value in use was set at zero. That is 0.5% of half-year operating income (our arithmetic). The documents name no customer, no tool price and no order book. High-bandwidth memory, advanced logic and co-packaged optics stay unpriced.

## Who else does this?

The saw and the grind are this invoice. Neighbouring steps are other companies' invoices.

[Tokyo Electron](https://www.sotkn.com/stack/semiconductors/what-does-tokyo-electron-do/) is paid for the coat, etch and clean before a wafer is ready to thin. [Besi](https://www.sotkn.com/stack/semiconductors/what-does-besi-do/) is paid when a hybrid-bonding tool is accepted, a join rather than a cut. [TSMC](https://www.sotkn.com/stack/semiconductors/cowos/what-does-tsmc-do/) is paid for the packaging slot a thinned die has to reach. [SK hynix](https://www.sotkn.com/stack/semiconductors/hbm/what-does-sk-hynix-do/) is paid for the memory stack the grinder is there to thin. Disco's 31% and 26% are not those four lines.

The presentation's shipment map is Asia 78%, Japan 10%, Europe 7% and North America 5%. Inside Asia: China 31%, including local factories of foreign manufacturers, Taiwan 26%, Korea 11%, Singapore 8% and other Asia 2%. Sales in the file were Japan ¥14,646 million, North America ¥7,833 million, Asia ¥110,695 million and Europe ¥9,575 million. Asia is 77.5% of ¥142,750 million (our arithmetic). Overseas sales were ¥128,104 million, a printed 89.7%. The 78% and the 77.5% are different bases. China's 31% is not a share of sales.

## What would change this view?

Acceptance is the step these documents show. The view changes if the quarter to 31 December prints sales near the guided ¥149,616 million of shipments, rather than the guided ¥132,442 million of sales. It changes if contract liabilities stop rising while shipments stay above sales. The presentation does not say payment-on-shipment covers every yen of that balance.

It also changes if a filing prices high-bandwidth memory, advanced logic or co-packaged optics, or names a customer. Consumable sales are 24% of this quarter, and the shipment guide already points tools down about 5%. A shipment guide is not yet sales. The move from a ¥159.4 average dollar to a ¥151 guide rate is unpublished as a margin split. A forecast past one quarter would change the clock too.

## Practical takeaways

Keep two clocks. The file prints ¥148,677 million shipped and ¥142,750 million accepted in the quarter to 30 September 2026\. The gap is ¥5,927 million. The company's next quarter, on our subtraction, is ¥149,616 million of shipments and ¥132,442 million of sales.

Keep three products. Equipment, 62% of sales, waits on acceptance. Consumable tools, 24%, move with utilisation and are guided down about 5% on shipments. Maintenance parts are 10%. Dicing saws were 31% of sales and grinders 26%, on rounded shares.

Asia sales were ¥110,695 million. On the shipment map, China is 31%, including foreign makers' local factories, and Taiwan is 26%. The limit is the tool that has shipped and has not been accepted. The ¥186 dividend, ¥20,182 million, is paid on 1 December. The half's cash dividends were ¥40,768 million.

Not investment advice. Do your own research.

## FAQ

**What does Disco do?**  
Disco designs and sells dicing saws, grinders and the blades and wheels those machines consume. It is paid for a machine when the customer accepts it. In the quarter to 30 September 2026, net sales were ¥142,750 million and shipments were ¥148,677 million.

**When does Disco recognise a machine sale?**  
When the customer inspects and accepts the equipment. The company said so on 23 July 2026, about April to June, and the 22 October summary says sales rose with progress on that acceptance. Shipment is an earlier clock.

**Why is the record shipment not the same as sales?**  
The financial file prints September-quarter shipments of ¥148,677 million and sales of ¥142,750 million. The difference is ¥5,927 million (our arithmetic). That is one quarter's flow, not a stock of unaccepted tools. Contract liabilities, which the presentation says include payment on shipment, were ¥79,623 million at 30 September, up from ¥50,006 million at 31 March.

**What share of sales is the saw, the grinder and the blade?**  
On the financial file, precision processing equipment was 62% of September-quarter sales, consumable tools 24%, maintenance parts 10% and other 4%. Inside equipment, dicing saws were 31% of sales and grinders 26%. Those inner lines are rounded and do not add to 62.

**What limits the next quarter?**  
The company's own guide. Cumulative forecasts through 31 December imply October-to-December sales of ¥132,442 million and shipments of ¥149,616 million (our arithmetic). That gap is wider than this quarter's ¥5,927 million. Consumable shipments are guided down about 5%. Cash and deposits were ¥342,411 million. The limit is acceptance. The file leaves orders blank.

**Is the ¥186 dividend already out of September cash?**  
No. The board set it on 22 October 2026, with a record date of 30 September and payment on 1 December, ¥20,182 million in total. Cash dividends paid during the half were ¥40,768 million, an earlier dividend. The 30 September balance sheet does not print a dividends-payable line.

**Is this a recommendation to buy Disco shares?**  
No. This page explains how Disco makes money and which step is waiting on acceptance. It gives no buy or sell calls. Not investment advice. Do your own research.

## Keep reading on the map

Layer: [Semiconductors](https://www.sotkn.com/stack/semiconductors/). The stack these tools thin is [HBM, explained](https://www.sotkn.com/explained/hbm-explained/). The package they have to fit is [CoWoS, explained](https://www.sotkn.com/explained/cowos-explained/). Why a running line buys another blade is [fab utilization](https://www.sotkn.com/explained/fab-utilization-explained/). The optics comment here is not a Disco sales line: [silicon photonics](https://www.sotkn.com/explained/silicon-photonics-explained/).

Neighbouring invoices: [Tokyo Electron](https://www.sotkn.com/stack/semiconductors/what-does-tokyo-electron-do/), [Besi](https://www.sotkn.com/stack/semiconductors/what-does-besi-do/), [TSMC](https://www.sotkn.com/stack/semiconductors/cowos/what-does-tsmc-do/) and [SK hynix](https://www.sotkn.com/stack/semiconductors/hbm/what-does-sk-hynix-do/). Markets doors: [Taiwan](https://www.sotkn.com/markets/taiwan/) and [Korea](https://www.sotkn.com/markets/korea/). There is no Disco Wire note. The packaging queue is a different page, the [advanced-packaging Wire](https://www.sotkn.com/wire/advanced-packaging-28-billion-cowos-tsmc-nvidia-spil-wire/).

[Get the Wire](https://www.sotkn.com/#/portal/signup) — short notes when a shipment, an acceptance or a tool guide moves.

## How we check this

Figures come from the 22 October summary, financial file, Japanese presentation, forecast notice and dividend notice, plus the 23 July notice for the acceptance rule and the ¥276.9 billion half-year shipment forecast. The summary is not an auditor's review. Shipments of ¥284,584 million minus that forecast are ¥7,684 million (our arithmetic). Nothing here is from a secondhand transcript. The gaps, the implied December quarter and the 25.1% dividend are our arithmetic. Acceptance as the limit is our read.

Last reviewed: 25 Nov 2026\. Next review: results for the quarter ending 31 December 2026, when shipments, sales and the guide are reprinted. Sooner if a filing names a customer, prices high-bandwidth memory, or prints an order book. [Our editorial standards](https://www.sotkn.com/editorial-standards/).

## Sources

1. Disco — six months to 30 September 2026 (22 Oct 2026). Half-year sales, cash flow, contract liabilities and the cumulative forecast. Not an auditor's review. [Japanese summary](https://www.disco.co.jp/jp/ir/library/doc/fr/fr20261022.pdf?ref=sotkn.com)
2. Disco — consolidated financial information (22 Oct 2026). Quarterly sales, shipments, mix, region and exchange rates. [Financial file](https://www-hq.disco.co.jp/eg/ir/library/doc/fr/fr20261022.xlsx?ref=sotkn.com)
3. Disco — Japanese presentation (22 Oct 2026). The ¥148.6 billion shipment, the shipment map, the December guide and the buildings. Japanese prevails. [Presentation](https://www-hq.disco.co.jp/jp/ir/library/doc/film/20261022.pdf?ref=sotkn.com)
4. Disco — forecast notice (22 Oct 2026). Why the guide stops at one quarter, and the cumulative forecast. [Forecast notice](https://www.disco.co.jp/jp/ir/library/doc/news/202610221%5F%E6%A5%AD%E7%B8%BE%E4%BA%88%E6%83%B3%E3%81%AE%E3%81%8A%E7%9F%A5%E3%82%89%E3%81%9B.pdf?ref=sotkn.com)
5. Disco — dividend notice (22 Oct 2026). ¥186 a share, ¥20,182 million, record date 30 September 2026, payment 1 December 2026\. [Dividend notice](https://www-hq.disco.co.jp/eg/ir/library/doc/news/202610222%5FNotice%5FRegarding%5FDistribution%5Fof%5FDividends%5Fof%5FSurplus.pdf?ref=sotkn.com)
6. Disco — first-quarter difference and half-year forecast (23 Jul 2026). Equipment sales on inspection and acceptance, and the ¥276.9 billion shipment forecast. [July notice](https://www-hq.disco.co.jp/eg/ir/library/doc/news/202607233%5FDifferences%20between%20Financial%20Forecasts%20and%20Actual%20Results%20for%20the%20First%20Quarter%20of%20Fiscal%20Year%202026,%20and%20Business%20and%20Dividend%20Forecast%20Notification%20for%20the%20First%20Half%20of%20Fiscal%20Year%202026.pdf?ref=sotkn.com)