> ## Content Index
> Fetch the complete content index at: https://www.sotkn.com/llms.txt
> Use this file to discover other available public pages before exploring further.

# Firmus pulls A$43.7B data center float with 46 MW running
- URL: https://www.sotkn.com/wire/firmus-pulls-asx-float-46-mw-running-wire/
- Published: 2026-10-10T06:00:13.000Z
- Updated: 2026-10-10T06:00:13.000Z
- Description: Nvidia-backed Firmus pulled its A$43.7 billion ASX float on 9 October. It has 46 MW running and about 865 MW still being built. The contracts pay only once halls are live, and the money to build them just walked away.
- Author: Sean
- Tags: #desk-wire

`WIRE` · `NEOCLOUDS` · `AUSTRALIA` · Data as at 10 Oct 2026

Firmus has pulled its ASX float. On **9 October 2026** the Nvidia-backed AI cloud builder withdrew a listing that would have raised about **A$7 billion** at a value near **A$43.7 billion**. The problem was the gap between what it has signed and what it has switched on: **46 MW** running, about **865 MW** still being built, and more than **900 MW** contracted to customers such as OpenAI and Meta. On the [neocloud model](https://www.sotkn.com/stack/neoclouds/), this is the build step: the contracts pay only once the halls are live, and the money to build them just walked away.

## What happened

6 to 8 October

**Books open at A$11 a share. By Thursday, bankers reportedly weigh A$8.25**

ABC News, Sydney Morning Herald, Forbes Australia

8 October

**Fit-out contractor Maas Group falls 22.4%, then enters a trading halt**

Maas owns 3.2% of Firmus and holds about A$1.2 billion of Firmus fit-out contracts

9 October

**Firmus withdraws its ASX application and turns to private capital**

Board cites market volatility. Reports say a Nasdaq listing is being weighed for next year

The footprint

**Two sites live, in Melbourne and Singapore. Five more under development in Australia, Malaysia and Indonesia**

Last year's revenue: US$50.8 million

---

## Why cash cares

A neocloud makes money when a customer runs on its GPUs. Firmus has signed big customers, but most of its capacity is a plan. A contract for a hall that doesn't exist yet earns nothing. Before it pays, someone has to fund the land, the power, the building and the chips.

The float was meant to be that money. Firmus planned to raise the cash, borrow more on top, and buy GPUs for its first Asian project in Batam, Indonesia, built with DayOne. Without it, the build has to be paid for some other way.

Our arithmetic, not a Firmus figure: 46 MW out of about 911 MW (running plus under development) is about **5%**. At A$43.7 billion, buyers were asked to pay roughly **A$950 million for every megawatt actually running**. Firmus was valued at A$1.85 billion in September 2025.

![Build-step bind: Firmus capacity running against capacity still being built](https://storage.ghost.io/c/cd/10/cd10e222-131f-4ba4-b4a9-ca4214e8c12d/content/images/2026/10/build-step-bind-print.png)

**Figure: Build-step bind.** The amber sliver is the capacity Firmus has running today. The grey bar is the capacity under development. The contracts sit on the grey bar, and the grey bar needs funding before it earns.

## The second-order read

**Who gets paid.** Nvidia, first. It sells Firmus the chips and owns about 7.2% of it, so it is paid on delivery whatever happens to the float. Reports say it may put in more.

**Who waits.** Builders and partners whose work depends on Firmus raising money. Maas Group's fit-out contracts and DayOne's Batam project both need the capital that just went missing. Meta and OpenAI wait for halls they have already contracted.

**Who pays.** Existing backers who marked Firmus near the float price. A private round or a Nasdaq listing will probably come at a lower value than A$43.7 billion.

**Stuck step.** The build, between a signed contract and a powered hall. Reuters also reported that data centre operator CDC said a planned 1.6 GW joint project with Firmus was no longer going ahead, which was one reason investors pulled their orders.

## Two cautions

The customer contracts still stand. Pulling a float is not the same as losing a customer. Firmus says it will raise privately instead.

The megawatt figures come from Firmus and from press reports of its prospectus. They are not audited numbers, and the timelines for the five sites have not been published here.

## What would change the view

- Firmus closes a large private round, or Nvidia adds a big new investment.
- It sets a Nasdaq listing date and a lower price.
- A customer delays or cuts a contracted site.
- Maas Group comes out of its trading halt with an update on its Firmus contracts.

## What to watch

- **Funding news**: the size and price of any private round, and who leads it.
- **Batam and Malaysia**: whether the first Asian builds keep their ready dates.
- **Other AI cloud floats**: whether more Asia-Pacific listings get pushed back after this one.

*Read: [Neoclouds](https://www.sotkn.com/stack/neoclouds/), [What Is an AI Data Center?](https://www.sotkn.com/explained/what-is-an-ai-data-center/), and [Australia Markets](https://www.sotkn.com/markets/australia/)*

---

**Get the Wire.** A free brief every day, here and in your inbox. **[Subscribe free →](https://www.sotkn.com/#/portal/signup)**

*Sources: [Sydney Morning Herald, 9 Oct 2026](https://www.smh.com.au/business/companies/firmus-weighs-up-postponing-float-report-20261009-p6143j.html?ref=sotkn.com): float withdrawn, US$5.5B raise, value near A$44B, two data centres operating, Batam project with DayOne, Nvidia and Blackstone among US$2B in commitments, Nasdaq option reported; [ABC News, 10 Oct 2026](https://www.abc.net.au/news/2026-10-10/how-firmus-the-biggest-ipo-in-three-decades-fell-over/107247100?ref=sotkn.com): A$43.7B valuation, about A$7B raise, price reportedly cut from A$11 to A$8.25, Nvidia stake of 7.2%; [Forbes Australia, 9 Oct 2026](https://www.forbes.com.au/news/investing/firmus-pulls-its-gigantic-ipo-heres-what-you-need-to-know/?ref=sotkn.com): 46 MW operational, 865 MW under development, US$50.8M revenue last year, A$1.85B valuation in Sep 2025, Maas Group 3.2% stake, A$1.2B fit-out contracts and 22.4% fall; [Firmus release](https://firmus.co/newsroom/firmus-surpasses-900-mw-contracted-capacity-adds-openai-as-anchor-customer-and-expands-into-malaysia?ref=sotkn.com): more than 900 MW contracted, OpenAI anchor at two Malaysian sites, two sites operating in Australia and Singapore, five under development; [Maas Group ASX announcement, 9 Oct 2026](https://announcements.asx.com.au/asxpdf/20261009/pdf/0754mnbd18xrj7.pdf?ref=sotkn.com): Firmus withdraws its listing application; [Reuters, 9 Oct 2026](https://d2233.cms.socastsrm.com/2026/10/08/australian-nvidia-backed-ai-data-centre-operator-firmus-shelves-ipo/?ref=sotkn.com): CDC comment on the 1.6 GW plan. The 5% share running and the value per running megawatt are our arithmetic. Not investment advice. Do your own research.*