AI Data Centers
What Does Nxera Do? Singtel's AI Data Center Arm Across Southeast Asia
Nxera is Singtel Group's regional data centre arm. Singapore capacity is 120 MW after DC Tuas (58 MW) opened in January 2026. The company guides ~230 MW operational by FY27 and >460 MW gross including pipeline, while Singtel takes 25% of STT GDC (~2.8 GW combined design).