TSMC files for a $22.6B Texas fab, with first chips in 2031

TSMC has filed for a Texas tax break on a proposed US$22.6 billion 2nm chip campus. Buildings come first, tools peak in 2030, chips in 2031. A fab filing is not a billed GPU hour.

Share
$22.6B Texas fab, first chips in 2031. Aerial view of a TSMC fab campus under construction in Arizona.
$22.6B TEXAS FAB / FIRST CHIPS IN 2031. Illustrative: TSMC Fab 21 under construction in Phoenix, Arizona (Nov 2023), not the Texas site. Photo: Hunter Trick via Wikimedia Commons, CC BY-SA 4.0, cropped and recoloured.

WIRE · SEMICONDUCTORS · FABS · Filed 23 Nov 2026 (Texas, United States)

TSMC has filed for a tax break on a proposed US$22.6 billion chip campus in Brazos County, Texas. The filing, posted by the Texas Comptroller on 23 November, says the site would make 2-nanometre-class chips for AI. Building would start in 2027. Commercial output would start in 2031. That is a plan to spend, not a plan that earns. A fab only turns into cash when its chips end up in a working GPU, and a customer uses that GPU and pays for the hour. On this filing, that hour is about five years away, on our count. See our Semiconductors layer for the map.

What happened

The filing

TSMC Arizona Corporation applied for a Texas school tax limit (application J0055) for a campus of one or more front-end fabs on about 3,232 acres near College Station

Posted by the Texas Comptroller on 23 November 2026. The College Station school district put the investment at US$22.6 billion in its hearing notice

The chips

The plant would make leading-edge logic chips on 2nm or more advanced processes, for AI, high-performance computing and phones

Per the filing, as reported by KBTX and Tom's Hardware on 24 and 26 November

The money

US$8.60 billion for buildings and US$14.02 billion, or 62%, for tools, machinery and equipment

Building spend runs 2027 to 2029. Tool spend peaks at US$9.05 billion in 2030, per Tom's Hardware's reading of the filing

The tax break

The Comptroller recommended the deal on 24 November. It puts the school tax benefit at about US$354 million over 20 years

TSMC calls the tax limit "determinative". Arizona is still the rival site. The Comptroller says it has not audited the company's projections

The votes

The College Station school board holds a public hearing on 10 December and may vote that day. The governor has until 24 December to decide

Both must agree. One "no" can kill the deal, KBTX reports. Separately, Bloomberg reports President Trump will attend TSMC's Arizona expansion ceremony on 4 December

Why cash cares

A fab is the most expensive step in the AI chain, and the slowest to pay back. The money goes out years before a single wafer comes back.

Look at the order of spending in the filing. Buildings come first, from 2027 to 2029, for US$8.60 billion. Tools come next. Tool spend starts in 2029 and peaks at US$9.05 billion in 2030, per Tom's Hardware's reading of the filing. That one year is about 65% of the US$14.02 billion tool budget, on our arithmetic. Commercial output starts in 2031. Full operations come in 2032.

So the first dollar of chip revenue from this site is about five years out, on our count from the 23 November filing to 2031. Even then, a wafer is not a billed hour. The wafer has to be cut into chips, packaged, built into a GPU, racked in a powered hall and rented to a customer who uses it and pays. Our fab utilization explainer covers why a full line is not spare wafers.

TSMC Texas: the steps between a tax filing and a billed GPU hour

Figure: A US$22.6 billion fab plan is a spending schedule first. Filing date, hearing date and spend from the Texas Comptroller J0055 page and College Station ISD notice (23 November 2026), KBTX (24 November 2026) and Tom's Hardware (26 November 2026). The 1.6% share and the five-year gap are our arithmetic.

The stuck step

The stuck step today is a tax vote.

TSMC told Texas the tax limit decides whether it builds there. Without it, the company says a new parcel in Arizona may be easier, with existing suppliers and staff nearby. The school board must agree. The governor must agree. Until both do, nothing in the filing commits TSMC to buy the land or build.

The tax break itself is small next to the build. About US$354 million against US$22.6 billion is about 1.6% of the cost, on our arithmetic. But small is not the same as unimportant. When two sites are close, a small edge can decide where the money lands.

After the vote, the stuck step moves. It becomes concrete, then tools, then people. The filing projects 2,099 direct jobs by 2030. The agreement would require only 35. Tool timing matters most. A 2030 tool peak lines up with TSMC's company-wide plan to use High-NA EUV that year, Tom's Hardware notes, but the filing does not name the tools.

Who gets paid, who pays and who waits

Who gets paid first. Builders, from 2027. Then tool and equipment makers, mostly in 2030. The tool line also covers cleanroom, water, gas, power and air systems, so it pays more than the chip-tool firms. Our fabless vs IDM explainer shows who owns this risk: the foundry carries the fab, the chip designer books the wafers.

Who pays. TSMC, up front, for buildings and tools. Texas, in part, through a smaller school tax bill on the project. KBTX reports the state would replace the lost school revenue. The Comptroller still expects the project to pay about US$405 million in school operating tax over 20 years.

Who waits. TSMC waits for wafer revenue until 2031. AI chip buyers who want 2nm made in the US wait too. By the filing's timeline, Texas would start on 2nm about six years after 2nm volume began in Taiwan in late 2025, per Tom's Hardware. Arizona's second fab is due to start 3nm volume in the third quarter of 2027.

Cautions

This is an application, not a decision. TSMC says it is still weighing Texas against Arizona.

The numbers are the company's projections. The Comptroller says it has not audited or verified them.

The spending schedule and job counts come from the filing as read by Tom's Hardware. We have read the school district notice and the Comptroller's posting page, not the full spreadsheet.

The 4 December Arizona ceremony is reported by Bloomberg, citing a White House official. Plans for the ceremony could change.

What would change the view

Better: the school board and governor approve in December, TSMC confirms Texas, and the build starts on time in 2027 with tool orders placed early.

Worse: the board or governor says no, TSMC picks Arizona instead, or the build and tool schedule slips past 2031.

What to watch

4 December 2026: TSMC's Arizona expansion ceremony, and any new dates for Arizona's third fab and packaging plants.

10 December 2026: College Station school board public hearing and possible vote.

24 December 2026: the governor's deadline to decide, with parties told by 31 December.

2027: whether construction starts in Brazos County, and whether Arizona's second fab hits 3nm volume in the third quarter.

Get the Wire. A free brief every day, here and in your inbox. Subscribe free →

If this Wire saved you a search, tip Second Order → sotkn.com/support

Not investment advice. Do your own research. The 1.6% share, the 65% tool-year share and the five-year gap are our arithmetic on the sources below. Featured image: TSMC Fab 21 under construction in Phoenix, Arizona, November 2023, by Hunter Trick via Wikimedia Commons (CC BY-SA 4.0), cropped and recoloured. Illustrative, not the Texas site.

References

  1. Texas Comptroller of Public Accounts, "J0055, College Station ISD, TSMC Arizona Corporation" (JETI application details), application posted 23 Nov 2026, recommendation packet posted 24 Nov 2026.
  2. College Station ISD, "Notice of Public Hearing: Application for Limitation on Taxable Value (J0055)", posted 23 Nov 2026. Hearing date, acreage, US$22.6 billion investment.
  3. KBTX, "TSMC tax break application heads to governor and school district", 24 Nov 2026. Recommendation, tax benefit, votes and deadlines.
  4. Tom's Hardware, "TSMC files for $22.6 billion Texas fab campus with local tax breaks", 26 Nov 2026. Spending by year, jobs, timeline.
  5. TrendForce, "Trump to Join TSMC's Arizona Expansion Ceremony" (citing Bloomberg and Commercial Times), 26 Nov 2026. 4 December ceremony, Arizona fab timing.