What Is a Bridge Facility?

A bridge facility is a short loan written so it can be replaced by a longer one. Nebius's Citi line steps the margin up every 90 days and is due on 16 October 2027.

Share
A short metal span over an amber gap in a dark GPU hall, the bridge facility whose margin rises every 90 days

EXPLAINED · Mechanism · Last reviewed: 26 Nov 2026 · Next review: when Nebius files a draw, prepayment or replacement of the 17 October 2026 Citi facility, and in any case before the 16 October 2027 maturity

A bridge facility is a short loan written so it can be replaced by a longer one. Interest can rise while the short loan is still outstanding, and the borrower may pay it off early without a penalty.

In short. On 17 October 2026 Nebius signed a Bridge Facility Agreement with Citibank for a senior secured term loan of $3.5 billion. The margin starts at 2.75% over Term SOFR and rises by 0.25 percentage point after each 90-day period, up to 3.50%, subject to other adjustments the filing does not describe. It is due on 16 October 2027. The filing does not say how much has been drawn. Our read: the stuck step is the longer loan that would replace this one.

Why an investor cares: a neocloud pays for GPUs before the hours pay them back, so the loan's shape decides who is paid first. This page is the short loan, on the Neoclouds layer. The long one is GPU financing.

What is a bridge facility?

A bridge facility is a loan whose job is to be paid off by a later loan. Nebius's Form 6-K filed on 22 October 2026 names the 17 October contract a Bridge Facility Agreement. The press release attached to that 6-K does not use the word bridge. It calls the signing a $3.5 billion senior secured facility and says it increases flexibility over the timing and structure of longer-term financing for growth in 2027 and beyond.

The 6-K allows prepayment without premium or penalty, which is how a loan is written when it is meant to be retired. The shareholder letter filed on 12 November 2026 calls the October line a short-term facility and says the company chooses the source and the timing: further prepayments, asset-backed financing, the balance sheet, corporate debt, or equity. A prepayment is a separate pot of cash, covered in what a customer prepayment is. None of that is a signed replacement.

What did Nebius agree on 17 October 2026?

Three borrowers signed: Nebius Group N.V., the Dutch parent; Nebius Inc., a Delaware limited liability company; and Nebius B.V., a Dutch private company. Citibank, N.A. is mandated lead arranger and lender. Affiliates of Citibank are agent and security agent. The facility is a senior secured term loan of $3.5 billion in aggregate principal.

The 6-K's purpose is the borrowers' GPU infrastructure and other general corporate purposes. The press release and Note 16 add data center development and GPU procurement. No seller or campus is named.

Interest is Term SOFR plus a margin that starts at 2.75% a year and increases by 0.25 percentage point for each 90-day period after 17 October 2026, up to 3.50%, subject to other adjustments. The maturity date is 16 October 2027. From the signing date to that maturity is 364 days, our arithmetic, which is the "364-day maturity" in the press release and in Note 16.

Security is a security interest on substantially all of each borrower's assets, including all shares of Nebius Inc. and Nebius B.V. held by the parent, with exceptions the 6-K does not list. There is a minimum liquidity covenant. The 6-K does not print the liquidity amount, any fee, the Term SOFR tenor, or the day-count.

Note 16, filed on 12 November 2026, records the facility as a subsequent event and dates the agreement 22 October 2026. It does not say Bridge Facility Agreement. We use 17 October as the 6-K's signing date and 22 October as the release date. We do not treat the two dates as two loans. Note 16 does not state a draw.

Why does the margin step up?

The step is the price of waiting. The printed cap, 3.50%, is 0.75 percentage point above 2.75%. That is three steps of 0.25, our arithmetic, so the cap lands 270 days after 17 October 2026. The dates below are our count from that day. The 6-K does not print them, and it says other adjustments can also apply.

Days after 17 October 2026Window, our arithmeticMargin over Term SOFR
0 to 8917 October 2026 through 14 January 20272.75%
90 to 17915 January 2027 through 14 April 20273.00%
180 to 26915 April 2027 through 13 July 20273.25%
270 to maturity14 July 2027 through 16 October 20273.50%, the printed cap

On each $1 billion actually outstanding, 0.25 percentage point of margin is $2.5 million a year, and the 0.75 point gap from the first window to the cap is $7.5 million a year, our arithmetic, before Term SOFR. The filings do not state the amount outstanding or the Term SOFR tenor, so this is not an interest bill.

How is the July term loan a different loan?

On 10 July 2026 a different pair of subsidiaries signed a different agreement. Nebius Compute II, LLC, a Delaware company, and Nebius Compute II Oy, a Finnish company, borrowed under a senior facility with various lenders and with MUFG Bank, Ltd. as administrative agent. Note 12 calls it a senior secured term loan of $773.3 million, primarily to finance the buildout of the group's AI cloud platform. The 12 November letter calls that July closing $775 million. We use $773.3 million.

The parent is not a borrower on the July loan. It gave a non-recourse guaranty for specified bad acts, and a performance guarantee of certain subsidiary obligations. Security is substantially all of those borrowers' assets, including, at 30 September 2026, $154.4 million of cash and restricted cash and $56.9 million of accounts receivable, plus their shares. They must keep debt service coverage of at least 1.15 to 1.00. The statements say they were in compliance. The bridge also has a minimum liquidity covenant, and neither filing prints the dollar level.

July interest is one-month CME Term SOFR plus 2.50%, paid monthly. Swaps fix that SOFR leg at a weighted-average 3.9%, so the hedged coupon is 6.40%, our arithmetic, before fees. The debt table's effective rate is 7.60%, which also amortizes about $16.6 million of lender fees and $3.9 million of issuance costs. The 7.60% is not the cash coupon. Monthly principal began on 15 August 2026, the last installment is 15 October 2030, and maturity is 31 October 2030. That span is 1,574 days. Against the bridge's 364 days, 1,574 / 364 = 4.32, our arithmetic. Principal outstanding at 30 September was $751.8 million, which is $21.5 million below the $773.3 million of borrowings in Note 6, our arithmetic. The July loan does not repay the October facility. How a long GPU loan draws as servers go live is in GPU financing.

Who gets paid — and where is the stuck step?

Citi is paid on whatever is drawn, at Term SOFR plus the stepping margin. No arrangement fee is printed. The July lenders are already in line for interest on the $751.8 million outstanding at 30 September 2026. Sellers of GPUs and of halls are paid only if proceeds follow the purpose clause, and no seller is named.

A later lender is paid only if a longer loan replaces the bridge. The 22 October release quotes chief operating officer Ophir Nave: one source still available is asset-backed financing on investment-grade customer commitments of more than $40 billion of long-term contracts. The 12 November letter says Microsoft and Meta agreements can be financed like the July facility, and that more than $40 billion of similar committed revenue makes that a repeatable framework. Both lines are the company's own words. The release marks future financing as forward-looking. Neither filing attaches a signed loan that pays off Citi.

Our read: that missing replacement is the stuck step. The margin rises every 90 days, prepayment carries no penalty, and the facility is due on 16 October 2027, with the parent on the hook rather than one contract's subsidiary. The contract that could back a later loan is a different document, in take-or-pay GPU contracts. Who sits in the lender's chair is in who finances GPU clusters.

At 30 September 2026, total debt principal was $16,478.0 million and cash and cash equivalents were $7,425.6 million. The letter rounds the cash to $7.4 billion. The Citi facility is a subsequent event, so it is not inside the $16,478.0 million. We do not add $3.5 billion to that principal. A filing that shows a draw, a prepayment, a replacement, or the liquidity number is what would change the read.

Common misconceptions

  • People assume $3.5 billion has already been borrowed. Actually the 6-K states the size of the facility. Neither it nor Note 16 states a draw. Principal of $16,478.0 million at 30 September 2026 does not include it.
  • People assume the press release and the 6-K use the same name. Actually the 6-K says Bridge Facility Agreement, dated 17 October 2026. The release and Note 16 say senior secured facility. Note 16 dates the agreement 22 October 2026.
  • People assume the October facility is the July term loan, written larger. Actually the July loan is $773.3 million to two subsidiaries, due 31 October 2030, at one-month CME Term SOFR plus 2.50%. The October facility is $3.5 billion, includes the parent, and is due 16 October 2027.
  • People assume 2.75% is the whole interest rate. Actually it is the starting margin on top of Term SOFR. The bridge 6-K does not state the tenor. The July statements do: one-month CME Term SOFR, swapped to a weighted-average 3.9%, plus 2.50%.

FAQ

What is a bridge facility?
A bridge facility is a short loan written so it can be replaced by a longer one. Nebius's 22 October 2026 Form 6-K gives the 17 October contract that name: $3.5 billion, due 16 October 2027, with a margin that steps up every 90 days.

How much of the Nebius Citi facility has been drawn?
The filings checked on 26 November 2026 do not say. The 22 October 6-K states a $3.5 billion facility, and Note 16 repeats the size as a subsequent event. Neither states an amount outstanding.

When does the margin on the Nebius bridge step up?
The 6-K says the margin rises by 0.25 percentage point for each 90-day period after 17 October 2026, from 2.75% up to 3.50%, subject to other adjustments. Ninety days after 17 October 2026 is 15 January 2027, our arithmetic, and the printed cap is 270 days out, on 14 July 2027.

Who borrows under the 17 October 2026 agreement?
Three borrowers: Nebius Group N.V., Nebius Inc., a Delaware company, and Nebius B.V., a Dutch company. The parent is a borrower, and the security includes the shares of the other two.

How is the July 2026 term loan different?
The July loan is $773.3 million borrowed by Nebius Compute II, LLC and Nebius Compute II Oy, and it matures on 31 October 2030. The parent is not a borrower. Its guaranty is non-recourse except for specified bad acts, plus a performance guarantee of certain subsidiary obligations. The margin is 2.50% over one-month CME Term SOFR and does not step up every 90 days.

What is the stuck step on a bridge facility?
Our read: the longer loan that has not been signed to replace it. The margin rises on a 90-day clock, prepayment is allowed without a penalty, and this facility is due on 16 October 2027. The company names other sources. It does not attach that replacement.

Is the Citi facility inside the 30 September debt total?
No. Principal outstanding at 30 September 2026 was $16,478.0 million. Note 16 records the Citi facility after that balance sheet and does not state a draw.

Is this a recommendation to buy or sell Nebius?
No. This page explains how a bridge facility differs from a term loan, and who it can pay. Not investment advice. Do your own research.

Related terms

Related: what a neocloud is; what GPU financing is; what a customer prepayment is; what a take-or-pay GPU contract is; who finances GPU clusters.

Markets and stack doors

Layer: Neoclouds. The bridge's US borrower is Nebius Inc., a Delaware company, and the July loan's US borrower is Nebius Compute II, LLC, also Delaware. Those sit on the US Markets door. Nebius Group N.V. and Nebius B.V. are Dutch, and Nebius Compute II Oy is Finnish. This page does not send them to a market door they are not.

Get the Wire, a free daily note on who pays for AI computing.

How we check this. The bridge terms are the 22 October 2026 Form 6-K and its Exhibit 99.1. The July loan, the 30 September debt and cash figures, the swaps, and Note 16 are the unaudited statements filed 12 November 2026. The letter filed the same day is the source for the short-term-facility line, the $775 million rounding, and the Microsoft and Meta sentence. Day counts and the margin dollars per billion are our arithmetic. Who is paid beyond the named lenders, and the stuck step, are our read. Not investment advice. Do your own research.

Last reviewed: 26 Nov 2026 · Next review: when Nebius files a draw, prepayment or replacement of the 17 October 2026 Citi facility, and in any case before the 16 October 2027 maturity

Spot an error? Tell us and we will correct it and note the change here.

Our editorial standards →

Sources

  1. Nebius Group — Form 6-K, Bridge Facility Agreement (filed 22 Oct 2026) — borrowers, $3.5 billion, margin step, maturity, security, liquidity covenant
  2. Nebius Group — Exhibit 99.1, press release (22 Oct 2026) — 364-day line, proceeds, chief operating officer on sequencing and the contracts
  3. Nebius Group — unaudited financial statements for the quarter ended 30 Sep 2026 (filed 12 Nov 2026) — July term loan, debt table, swaps, cash, Note 16
  4. Nebius Group — letter to shareholders (filed 12 Nov 2026) — short-term facilities, $775 million rounding, Microsoft and Meta, choice of source

Sean

Writes Second Order by TKN — a plain-English map of AI infrastructure and semiconductors for non-specialist investors. Focus: who gets paid, where money sticks, and which step is stuck.

Author page → · Editorial standards →