What Is a Meet-Me Room? Where Data Center Networks Connect, and Who Gets Paid

A meet-me room is the secured room in a data center where different networks end and are patched together. The owner bills a monthly fee for each patch cable. AI halls bring megawatts, not cables, so that fee is growing more slowly than the power.

Share
Photo of a fiber patch panel in a data center floor box with blue fiber patch cords, graded night navy, overlay paid per cable, not per megawatt
A fiber patch panel in a data center floor box (photo by Robert.Harker, 1 October 2012, CC BY-SA 3.0, Wikimedia Commons), graded by Second Order. Not a site named in this article.

EXPLAINED · Mechanism · Last reviewed: 27 Nov 2026 · Next review: after Equinix’s and Digital Realty’s fourth-quarter 2026 results and NEXTDC’s half-year results (all early 2027)

A meet-me room, often shortened to MMR, is a secured room inside a data center where the cables of different carriers, clouds and customers end and are patched to each other. The building owner is paid a monthly fee for each patch cable, called a cross connect, so the room is a toll booth that charges per cable, not per megawatt.

In short. A meet-me room is where networks plug into each other inside a data center. The owner charges for each cable, every month. Who gets paid: the building owner. Equinix booked $465 million of interconnection revenue in the third quarter of 2026, up 10%. The stuck step: AI halls add megawatts, not cables. At Digital Realty, occupied megawatts rose 10.5% in the year to the third quarter of 2026, but cross-connects rose only 2.8% (our arithmetic). The room is paid per cable, so the fee grows more slowly than the power.

Why an investor cares: a meet-me room looks like a cabling closet, but it is a way of being paid. The owner earns a fee on every cable, month after month, and many of those fees can be ended at short notice. The big AI leases pay for megawatts. This fee pays for connections, and it grows on a different clock. This page builds on what an AI data center is, our carrier-neutral data center explainer and our cloud interconnect explainer, and answers one question: what is a meet-me room, and who gets paid for it?

What is a meet-me room?

It is a room inside a data center where the cables of different networks come in and end. A carrier brings fiber from the street. A cloud company brings a private line. A customer brings a cable from its own racks. They all end on patch panels in the same secured space.

That is the “meet” in the name. Two networks that want to talk to each other do not need to run their own fiber through the city. They ask the building owner to join their two cables in the room. The joining cable is called a cross connect.

Digital Realty uses the term in its 2025 annual report. It describes a product called Precabling: fiber laid ahead of time between customers and providers in a central Meet-Me-Room, so a new link is easier to install. Our own wording above is a plain description. No filing we read gives a formal definition, and the term has no legal or technical standard.

Four words help when you read about it.

  • Meet-me room (MMR). The place where networks’ cables end and are joined.
  • Cross connect. One cable between two customers in the same building. Equinix describes it as a point-to-point cable link between two of its customers in the same data center.
  • Carrier-neutral. A building open to many carriers and clouds, not tied to one network owner.
  • Interconnection. The general word for all the ways customers link up inside the building: cross connects, ports, exchanges and virtual links.

What happens inside a meet-me room?

Here is the path of a single cable, in plain steps. This is our description of the process, not a company’s procedure.

  • A carrier gets in. It brings fiber into the building through a street connection. Telstra InfraCo says its sites have multiple street fibre connection pits so that more than one carrier can enter.
  • The fiber ends in the room. It lands on a patch panel. The owner decides who is allowed in and where each panel sits.
  • Two customers decide to connect. One might be a carrier and the other a bank, a cloud or a content company. One of them orders a cross connect.
  • Staff run the cable. A technician patches one panel to the other. The two customers can now exchange traffic with no public internet in the middle.
  • The owner starts the bill. COLO BIRD in Singapore says it charges a one-time fee to set up and remove a connection, plus a monthly fee. Digital Realty says cross-connect installation revenue is generally recognised when the cable is installed, and the service is billed monthly after that.

The cable is short. The idea is simple. That is also why it is a good business: the owner already has the building, the security and the carriers, and each new cable adds a fee.

Meet-me room vs cross connect vs internet exchange vs cloud on-ramp

The four terms get mixed up. One is a place, one is a cable and two are services. The table sorts them.

QuestionMeet-me roomCross connectInternet exchangeCloud on-ramp
What it isA secured room where networks’ cables endOne cable between two customers in the same buildingA shared service where many networks swap trafficA private link from your gear to a public cloud
Place, cable or servicePlaceCableServiceService
Who gets paidThe building owner, through the fees for cables run in the roomThe owner, a one-time set-up fee and then a monthly feeThe exchange operator, for portsThe cloud and the operator or partner
Example from the filingsTelstra InfraCo: three Meet Me Rooms in three buildings at St LeonardsDigital Realty: about 237,500 cross-connects at 311 data centersEquinix: one port can reach many peersTelstra InfraCo: Megaport on-ramp needs a paid cross-connect
What limits itWhich carriers are in the buildingWhether two tenants choose to connectHow many networks joinWhether the cross connect is finished

Examples are from each company’s own filings or web pages listed under References. A single building usually has all four.

Equinix’s annual report also describes its Internet Exchange: networks can aggregate traffic to many peers on one physical port, and move their busiest peers onto private cables. That is the cheap way to meet many networks at once. A cross connect is the dedicated way to meet one network. For the cloud side of this, see our cloud interconnect explainer, which covers the port fees and the jumper that links your rack to the cloud’s port.

Who gets paid at a meet-me room?

The building owner, and the pay comes in small, steady amounts. Two global landlords show the size.

Equinix reported $465 million of interconnection revenue in the third quarter of 2026, up 10% on a year earlier. That is about 18% of its total revenue of $2,571 million, and about 19% of its recurring revenue of $2,442 million (our arithmetic). Its annual report says interconnection is typically billed on outbound connections and produces monthly recurring revenue. In 2025 it was $1,655 million of $8,739 million of recurring revenue.

Digital Realty reports a line called interconnection and other. It was $131.4 million in the third quarter of 2026, against $120.4 million a year earlier, up 9.1% (our arithmetic). That was about 6.9% of its total operating revenues of $1,902.4 million, down from 7.6% a year earlier (our arithmetic), because the rest of the business grew faster. Digital Realty’s annual report says its interconnection services run month-to-month, for one year or for several years.

Read the contract terms. Equinix says in its quarterly report that the majority of its interconnection revenue comes from contracts that could be ended without any significant penalty. That is why it sits outside the company’s reported remaining performance obligations. A cross connect is revenue you earn again every month, and a customer can walk away. A long lease for megawatts is the opposite. Our data center lease explainer and colocation explainer cover the lease side.

Why do AI data centers add megawatts faster than cables?

Our read: one big AI tenant needs a lot of power and few cables to other tenants. The cable fee depends on how many different networks plug in, not on how many megawatts are sold. The numbers below fit that read.

Digital Realty’s numbers show the gap. Its cross-connects rose from about 231,000 to about 237,500 in the year to the third quarter of 2026, a rise of 6,500 or 2.8% (our arithmetic). Over the same year its occupied megawatts rose from 2,602 to 2,874, a rise of 10.5% (our arithmetic). So cables per occupied megawatt fell from about 88.8 to about 82.6, down 6.9% (our arithmetic). Digital Realty says its cross-connect count is approximate, and the figures cover about 311 data centers.

Bar chart: Digital Realty year-on-year change to Q3 2026: occupied megawatts +10.5%, interconnection and other revenue +9.1%, cross-connects +2.8%
Digital Realty year-on-year change to Q3 2026; growth rates are our arithmetic; chart by Second Order.

The interconnection and other revenue line grew 9.1%, much faster than the cable count. We cannot say why from the filing. It holds more than cross connects, and price, ports and other services all count. The cable count is the cleaner measure of the room itself.

NEXTDC, in Australia, splits its connections by type of customer. At 30 June 2026, cloud and AI customers held 95% of its contracted megawatts but only 9% of its cross connects, counting physical and elastic connections. ICT providers held 59% of the cross connects, and enterprise and government customers 32%. Interconnection was 9% of FY26 net revenue of A$405.0 million, so roughly A$34 million to A$38 million, depending on rounding (our arithmetic). The few big tenants bring the power. The many small ones bring the cables.

Our carrier-neutral data center explainer tells that NEXTDC story from the landlord’s side. Here the point is the room: its income depends on a crowd, and an AI hall is not a crowd.

What is the stuck step for a meet-me room?

The stuck step is getting two networks to choose to plug in. A room full of empty patch panels earns nothing. Equinix says in its quarterly report that the more balanced the customer base in a building, the better it can earn interconnection revenue. In plain words, it needs a mix of carriers, clouds and companies in the same place.

Three things can hold that back.

  • The crowd is thin. Cables follow the number of networks in the building. A new campus with one tenant has few.
  • Customers can bypass the room. Equinix lists, as a risk, that network, cloud and content providers may use other models that bypass colocation and so reduce demand for its interconnection. Private fiber between a company’s own sites is one such route. Our dark fiber explainer covers it.
  • The room is a single point. That is why operators build more than one. Telstra InfraCo says its St Leonards data center has three Meet Me Rooms in three separate buildings, for triple fibre redundancy.
Infographic: four steps from street fiber to a paid cable at a meet-me room; step three, two customers choosing to connect, is the stuck step
From street fiber to a paid cable; by Second Order.

Operators are trying to pull AI tenants into the crowd. Equinix said in its third-quarter release that it introduced Fabric One, a connectivity service with AWS and Google Cloud as lead integration partners, and announced an Inference Exchange with NVIDIA and Together AI. It gave no results for either yet. Fabric revenue grew 24% in the quarter, on its own measure. These are plans to add connections. They are not proof that AI halls fill the room with cables.

Meet-me rooms in Singapore, Australia and Malaysia

Singapore. COLO BIRD’s SIN-1 site in Serangoon is a small, clear example: 7.3 MW, with multiple regional meet-me-rooms, and it says all local internet service providers are represented. It sells cross connects two ways: pay-as-you-go, with a one-time set-up and removal fee, or a committed entitlement at a lower monthly rate. That is an operator’s own web page, not an audited figure. Equinix reports Asia-Pacific as one region. Its interconnection revenue there was $95 million in the third quarter of 2026, against $83 million a year earlier, up 14.5% (our arithmetic), faster than the 10.2% worldwide (our arithmetic). It gives no Singapore split. See our Singapore door, and our note on Equinix SG6.

Australia. Telstra InfraCo’s St Leonards site in Sydney has the three-room design above, and it says non-Telstra customers are welcome because the site is carrier neutral. A Megaport cloud on-ramp at its sites needs a Telstra cross connect at extra charge, which is the per-cable fee in action. NEXTDC gives the customer-type split. See what NEXTDC does and our Australia door.

Malaysia. TelcoHubeXchange runs a carrier hotel that houses the Malaysia Internet Exchange, MyIX, and says it has multiple meet-me rooms and sells cross connects for fiber, copper and coaxial cable. That is its own web page and gives no figures. NEXTDC delivered 10 MW at KL1 in Kuala Lumpur in FY26 and has 15 MW more in progress there, but we found no filing that splits out cross connects or interconnection revenue for Malaysia, so we give no figure. Watch our Malaysia door for dated notes.

What would change this view?

  • Cables per megawatt stop falling. If Digital Realty’s cross-connects start to grow as fast as its occupied megawatts, AI tenants are plugging in after all.
  • AI tenants buy cross connects at scale. If the cloud and AI share of cross connects at NEXTDC climbs well above 9%, the power customers are also becoming cable customers.
  • Fabric One or Inference Exchange show numbers. If Equinix reports customers and revenue from them, the plan is working.
  • Prices slip. If the fee per cable falls because customers use virtual links or negotiate volume plans, the room earns less per connection.
  • Customers bypass the room. If more traffic moves on private fiber between sites, fewer cables are needed inside any one building.

How to read a meet-me room or interconnection headline

  • Is it cables or dollars? A count of cross connects and a revenue line are different measures. Digital Realty’s revenue line holds more than cables.
  • Is it a place, a cable or a service? A new meet-me room is capacity to host cables. It is not revenue until tenants order them.
  • Who is in the room? Carriers, clouds and companies make cables. A single AI tenant makes few.
  • How long is the contract? Month-to-month fees can end quickly and sit outside backlog.
  • Is the count the same measure? Equinix’s “net interconnections added” (6,900 in the third quarter of 2026) and Digital Realty’s cross-connects are not defined the same way. Do not compare them.

FAQ

What is a meet-me room in simple terms?
It is a secured room inside a data center where the cables of different networks end. Staff patch one customer’s cable to another’s there. Digital Realty’s annual report uses the term for a central room where customers and providers connect through pre-installed fiber.

What does MMR stand for in a data center?
Meet-me room. Some operators write it with hyphens, and some spell out “meet me room”. It is not a legal or technical standard, so the rooms differ in size and layout from one operator to the next.

What is the difference between a meet-me room and a cross connect?
The meet-me room is the place. The cross connect is the cable. Equinix describes a cross connect as a point-to-point cable link between two customers in the same data center. The owner bills a monthly fee for each one.

Who pays for a cross connect?
Usually the customer that orders it, and sometimes both sides. COLO BIRD in Singapore bills a monthly fee plus a one-time fee to set up and remove each connection. Digital Realty says its interconnection terms are month-to-month, one year or multi-year.

How much do data center owners earn from interconnection?
Equinix booked $465 million of interconnection revenue in the third quarter of 2026, about 18% of its revenue (our arithmetic). Digital Realty booked $131.4 million of interconnection and other revenue, about 7% of its revenue (our arithmetic). NEXTDC says interconnection was 9% of its FY26 net revenue.

Do AI data centers need a meet-me room?
Our read: a campus leased to one big tenant needs far fewer cross connects than a shared building with many tenants. The numbers fit: cloud and AI customers held 95% of NEXTDC’s contracted megawatts but 9% of its cross connects.

Is a meet-me room the same as an internet exchange?
No. An internet exchange is a service where many networks swap traffic over shared ports. It usually sits inside a building with a meet-me room. Equinix describes its Internet Exchange as letting networks aggregate traffic to many peers on one physical port.

Why do some data centers have three meet-me rooms?
For safety. Telstra InfraCo says its St Leonards data center in Sydney has three Meet Me Rooms in three separate buildings, which gives triple fibre redundancy. If one room is cut off, the others still carry traffic.

Is this a list of stocks to buy or sell?
No. This page explains how the money and the constraints move around meet-me rooms. It does not give buy or sell calls. Not investment advice.

Related: what is an AI data center; carrier-neutral data centers; colocation; colocation providers; retail vs wholesale colocation; cloud interconnect; dark fiber; edge data centers; who makes AI cluster networking.

Stack doors

Layer: AI Data Centers. Companies: Equinix, Digital Realty, NEXTDC. Also: Neoclouds, Hyperscalers, Semiconductors. Markets: Australia, Malaysia, Singapore, US.

Get the Wire — short daily notes when a data center deal names its size, its customer and its date.

How we check this

Figures come from Digital Realty’s annual report on Form 10-K for 2025 (filed 13 February 2026) and its third-quarter 2026 earnings release and supplemental of 29 October 2026; Equinix’s annual report on Form 10-K for 2025 (filed 11 February 2026), its third-quarter 2026 results release and its quarterly report on Form 10-Q (both 28 October 2026); NEXTDC’s FY26 results presentation and ASX announcement of 27 August 2026; and the operator web pages of Telstra InfraCo, COLO BIRD and TelcoHubeXchange. Each source was fetched on 27 November 2026. No filing we read defines “meet-me room” as a standard term. Our description of what happens in the room is ours; the company statements are quoted as the companies make them. Digital Realty says its cross-connect count is approximate. Equinix counts “interconnections”, which include virtual connections, so its figures and Digital Realty’s are not the same measure. Digital Realty’s “interconnection and other” line holds more than cross connects. NEXTDC’s 9% is rounded, so our A$ figure is a range. Operator web pages are marketing claims, not audited figures. Equinix reports Asia-Pacific as one region, with no split for Singapore. Dollar figures are US dollars for Equinix and Digital Realty and Australian dollars for NEXTDC; we do not convert or add them. Every share, ratio or growth rate we derived is labelled “our arithmetic”. The featured photo shows a fiber patch panel in a data center floor box, taken by Robert.Harker on 1 October 2012 and licensed CC BY-SA 3.0 on Wikimedia Commons, graded by Second Order; it is not a site named here. This page explains how the money and the constraints move. It does not give buy or sell calls. Not investment advice. Do your own research.

Last reviewed: 27 Nov 2026 · Next review: after Equinix’s and Digital Realty’s fourth-quarter 2026 results and NEXTDC’s half-year results (all early 2027)

Spot an error? Tell us and we will correct it and note the change here.

Our editorial standards →

References

  1. Digital Realty Trust — Form 10-K for the year ended 31 Dec 2025 (SEC, filed 13 Feb 2026) — Precabling product connecting customers and providers in a central Meet-Me-Room; interconnection services include port and cross-connect services on month-to-month, one-year or multi-year terms, billed monthly; cross-connect installation revenue recognised when installed
  2. Digital Realty — Third-quarter 2026 earnings release and supplemental (8-K exhibit 99.1, 29 Oct 2026) — cross-connects about 237,500 vs 231,000 a year earlier; occupied megawatts 2,874 vs 2,602; 311 data centers; interconnection and other revenue $131.4 million vs $120.4 million; total operating revenues; interconnection $22 million of $627 million bookings at its share
  3. Equinix — Third-quarter 2026 results release (28 Oct 2026) — interconnection revenue $465 million, up 10%; Americas, EMEA and Asia-Pacific interconnection revenue; 6,900 net interconnections added; Fabric One and Inference Exchange announced
  4. Equinix — Form 10-Q for the quarter ended 30 Sep 2026 (SEC, filed 28 Oct 2026) — most interconnection revenue is in contracts that could be ended without significant penalty and so sits outside remaining performance obligations; risk factors on bypass of colocation and balance of customers
  5. Equinix — Form 10-K for the year ended 31 Dec 2025 (SEC, filed 11 Feb 2026) — cross connects described as point-to-point cable links between two customers in the same data center; Internet Exchange; Fabric; interconnection typically billed on outbound connections and generates monthly recurring revenue; 2025 interconnection revenue $1,655 million of $8,739 million recurring revenue
  6. NEXTDC — FY26 results presentation (27 Aug 2026) — at 30 June 2026 cloud and AI customers held 95% of contracted megawatts and 9% of cross connects (physical and elastic); ICT providers 59% of cross connects; interconnection revenue 9% of FY26 net revenue
  7. NEXTDC — FY26 results ASX announcement (27 Aug 2026) — FY26 net revenue A$405.0 million; 80 MW added including 10 MW at KL1 Kuala Lumpur and 15 MW more in progress there
  8. Telstra InfraCo — Data centre colocation (accessed 27 Nov 2026) — St Leonards data centre has three Meet Me Rooms in three separate buildings; carrier-neutral access with multiple street fibre pits; cross-connect to Megaport needs a Telstra InfraCo cross-connect at extra charge
  9. COLO BIRD — Singapore data center SIN-1 (accessed 27 Nov 2026) — 7.3 MW site with multiple regional meet-me-rooms; all local ISPs represented; cross connects sold pay-as-you-go or by committed entitlement, with one-time set-up and removal fees
  10. TelcoHubeXchange — Data centre services, Malaysia (accessed 27 Nov 2026) — carrier hotel housing the Malaysia Internet Exchange (MyIX); multiple Meet-Me-Rooms; cross connect services for fiber, copper and coaxial

Sean

Writes Second Order by TKN — a plain-English map of AI infrastructure and semiconductors for non-specialist investors. Focus: who gets paid, where money sticks, and which step is stuck.

Covers AI infrastructure, semiconductors, and second-order stack reads.

Author page → · Editorial standards →