What Is Photoresist? The Light-Sensitive Coat on Every Chip, and Who Gets Paid

Photoresist is the light-sensitive coat spread on a wafer so a lithography machine can print a chip’s pattern into it. It is a small cost, but every layer needs it, and a new resist can take a year or more to pass a chipmaker’s tests. That slow swap is where the money sticks.

Share
What is photoresist: a silicon wafer on a spin coater with a fresh puddle of photoresist, the film glowing amber in a dark navy and teal grade
A wafer on a spin coater with a fresh puddle of photoresist, photo by Sei via Wikimedia Commons (CC BY-SA 4.0); grade and text added by Second Order. Illustrative, not tied to any company named in this article.

EXPLAINED · Mechanism · Last reviewed: 26 Nov 2026 · Next review: when Tokyo Ohka Kogyo reports its full year to 31 December 2026, or when Fujifilm says its Pyeongtaek EUV resist line is in full-scale mass production

Photoresist is a light-sensitive coating spread on a silicon wafer, so that a lithography machine can print a chip’s circuit pattern into it before the wafer is etched.

In short. What is photoresist? It is the light-sensitive coat on a wafer that takes the print of a chip’s pattern. The scanner shines the pattern on, a developer washes part of the coat away, and what is left guards the wafer while it is etched. Then the coat is stripped and the cycle starts again for the next layer. It is a small part of what a chip costs, but every patterned layer needs it, and each resist is tuned to one chipmaker’s line. Our read: the stuck step is qualification. Fujifilm started new EUV resist lines in October 2025 and a year later was still not in full-scale mass production. That slow swap is why a few Japanese chemical makers keep getting paid, and why Tokyo Ohka Kogyo’s resist division grew 27.3% in the nine months to September 2026.

Why an investor cares: photoresist is one of the few materials every patterned layer of every chip passes through, and the companies that make it are paid each time a fab runs a wafer. This page sits in our Semiconductors layer. It follows our photomask explained page, which covers the stencil the light passes through, and sits beside our EUV lithography explained page, which covers the machine that does the printing.

What is photoresist?

Think of making a chip like printing a T-shirt with a stencil. You need three things: a stencil, a light or ink to push through it, and a surface that remembers where the light landed. In chipmaking the stencil is the photomask, the light comes from a lithography scanner, and the surface that remembers is the photoresist.

Photoresist is a liquid when it arrives at the fab. A machine drops a small puddle onto the centre of a silicon wafer and spins the wafer fast, so the liquid spreads into a thin, even film. The photo at the top of this page shows that moment: a fresh puddle of resist on a wafer, just before it spreads.

Once dry, the film is sensitive to light. Where the scanner’s light hits it, the chemistry changes. A liquid called a developer then washes away either the parts that were hit or the parts that were not. What is left is a pattern in resist, sitting on top of the wafer.

That pattern is not the chip. It is a shield. The wafer then goes to an etch or implant tool, which works only on the open parts. After that the resist is stripped off, the wafer is cleaned, and the whole cycle repeats for the next layer. A modern chip is built from many layers, so a single wafer goes through this loop many times.

The name explains the job. It is “photo” because it reacts to light. It is “resist” because, once patterned, it resists the etch. Our silicon wafer explained page covers the disc underneath.

How does photoresist work, step by step?

Each pass through the loop has the same five steps. The tools change from layer to layer, but the order does not.

  • Coat. The wafer is spun while resist is dropped on it. Speed and timing set how thick the film is.
  • Bake. Gentle heat drives out the solvent so the film is firm before it is exposed.
  • Expose. The scanner shines light through the photomask, and the pattern lands on the resist. This is the step that uses the expensive machine.
  • Develop. A developer washes away part of the film. In many resists a second bake comes first, to finish the chemical change the light started.
  • Etch, then strip. The open parts of the wafer are etched or treated. The resist that shielded the rest is then removed.

The coating, baking and developing happen on a machine called a coater-developer, or track, which sits right next to the scanner. Our Tokyo Electron Stack page covers the company best known for that machine. The scanner itself is covered in our ASML Stack page.

What is photoresist infographic: five steps repeated for every chip layer, coat, bake, expose, develop, etch then strip, with qualification of a new resist as the stuck step
How photoresist is used, layer by layer. Infographic by Second Order.

Positive vs negative photoresist

There are two ways to read the light. In a positive process, the parts the light hits become easy to wash away, so the pattern left behind is a copy of the dark parts of the mask. In a negative process it is the other way round: the parts the light did not hit wash away.

Neither is better for every job. Chipmakers pick the one that gives the cleanest edges for a given layer. Fujifilm, for example, says it was the first to develop and sell a negative-tone imaging process, which removes the unexposed areas using high-purity organic solvents instead of the usual alkaline developer. It says the process became widely used with ArF lithography.

Positive processNegative process
What washes awayThe parts hit by lightThe parts not hit by light
What staysA copy of the dark parts of the maskA copy of the bright parts of the mask
DeveloperUsually a water-based alkaline liquidCan be an organic solvent, as in Fujifilm’s negative-tone imaging
Why choose itLong-standing default for many layersCan give sharper small openings, such as holes and trenches

Fujifilm describes its negative-tone imaging as a process in which the unexposed areas are removed by the developer, using high-purity organic solvents instead of traditional alkaline developers (29 October 2024). The rest is Second Order’s summary.

What types of photoresist are there?

Resists are sorted mainly by the light they are made for. Each new kind of light needed a new kind of resist, because a coating tuned for one wavelength does not react properly to another.

ASML, which makes the scanners, gives the history. Its first systems used blue mercury-lamp light at 436 nanometres, then 365 nanometres. Lasers came next: krypton fluoride at 248 nanometres, then argon fluoride at 193 nanometres, which ASML says can print features of 38 nanometres. Its EUV machines use light of 13.5 nanometres, more than 14 times shorter than that deep ultraviolet light.

Light usedWavelengthSmallest features ASML citesWhat the resist must do
Mercury g-line436 nmAbout 1 micron (1,000 nm)React to visible blue light
Mercury i-line365 nmDown to 220 nmReact to near ultraviolet light
KrF laser (DUV)248 nmDown to 80 nmChemically amplified: light makes acid, acid does the work
ArF laser (DUV)193 nm38 nmChemically amplified, tuned for deep ultraviolet; still the workhorse for many layers
EUV13.5 nmMuch finer; Fujifilm says EUV is needed below 10 nm generationsCatch very few photons evenly; chemically amplified, metal-oxide or dry resist

Wavelengths and feature sizes are as ASML describes its own tools (page read 26 November 2026). ArF light is about 14 times longer than EUV light, by our arithmetic. The last column is Second Order’s summary, drawing on Fujifilm (29 October 2024) and Lam Research (29 January 2025).

Inside each group there is a second split, by chemistry. Most resists for deep ultraviolet and early EUV are chemically amplified. When light hits the film, it creates a small amount of acid. During a bake, each bit of acid then changes many more molecules around it. That way a little light goes a long way.

Newer EUV resists take other routes. Metal-oxide resists, the speciality of Inpria, which JSR bought in 2021, are built on metal oxides rather than only a polymer. Dry resist, from Lam Research, is laid down as a film by a machine and developed dry, instead of being spun on as a liquid and washed. Our EUV vs DUV page explains why fabs still use both kinds of light.

Why is EUV photoresist so hard?

Because EUV light arrives in very few, very energetic packets. A resist that must print features below 10 nanometres has very few photons to work with in each tiny spot. If one spot gets a few too many and its neighbour a few too few, the edges of a line wobble or a hole fails to open.

The industry calls that wobble line-width roughness. Fujifilm said on 29 October 2024 that a new ingredient in its EUV resist cut line-width roughness by about 17% against the same resist without it. That is the kind of gain resist chemists fight for.

Lam Research described the same trade-off from the other side. In its 29 January 2025 release on dry resist, it said its process overcomes the usual trade-off between exposure dose and defects. Lam also said its dry process uses five to ten times less chemicals than traditional wet resist.

There is a cost problem too. EUV scanners are costly, and THE ELEC reported on 21 October 2026 that they cost roughly ₩250 billion to ₩500 billion each. Fujifilm told the paper that even large resist makers find it hard to buy their own, so they test new resists on shared tools at imec, the Belgian research institute. Our High-NA EUV explained page covers the next, even pricier machine.

Who makes photoresist?

Photoresist is made by a short list of chemical companies, and the best-known ones are Japanese. Here are the ones we can describe with dated facts.

CompanyWhat it sells in resistLatest dated fact we use
Tokyo Ohka Kogyo (TOK)Photoresists and high-purity chemicalsElectronic functional materials ¥115.8bn in nine months to September 2026, up 27.3% (10 Nov 2026)
JSR, with InpriaPhotoresists; Inpria makes metal-oxide EUV resist in OregonInpria bought for about US$421m (29 Oct 2021); JSR taken over by JIC at ¥4,350 a share (tender result 17 Apr 2024)
FujifilmArF and EUV resists, developers and other fab materialsEUV resist sales began 29 Oct 2024; Pyeongtaek line not yet in full-scale mass production (21 Oct 2026)
Lam ResearchTools for dry resist, not a liquid resistAether chosen as production tool of record for a memory maker’s most advanced DRAM (29 Jan 2025)

This is not a full list of resist makers and not a market-share table. We could not find a current, primary market-share figure, so we do not quote one.

Tokyo Ohka Kogyo, usually called TOK, is the clearest listed example. Its electronic functional materials division, which holds its photoresists, made ¥115.8 billion of sales in the nine months to September 2026, up 27.3% from a year earlier. That was 53.2% of the company’s sales, by our arithmetic. TOK said growth came from demand for AI servers for data centres.

JSR is the other big Japanese name. In October 2021 it completed the purchase of Inpria, an Oregon company that develops and makes metal-oxide EUV resist, for about US$421 million, or about ¥46.7 billion. Before the deal it already owned 21.3%. Then, in April 2024, JIC Capital, an arm of the state-backed Japan Investment Corporation, won its tender offer for JSR at ¥4,350 a share. Holders tendered 175,272,231 shares, against a minimum of 138,507,100. Our read: a state-backed fund paying to take a resist maker private shows how Japan sees the material.

Fujifilm is the newer challenger at the very front. It began selling negative-tone EUV resist and developer on 29 October 2024, and said it would add production and quality-checking capacity at Shizuoka in Japan and at Pyeongtaek in South Korea. Both lines began operating in October 2025. THE ELEC later reported that Pyeongtaek was picked to be near Samsung.

Lam Research is a different kind of player. It does not sell a resist in a bottle. It sells the machines for a dry resist process, so its gain comes as tool sales, the same way it is paid for etch. Our Lam Research Stack page covers that model.

How big is the photoresist business?

Small next to the chips it helps make, and growing fast. TOK gives the clearest public readout, because it reports a division that holds its resists.

Across the whole company, TOK’s sales in the nine months to September 2026 were ¥217.5 billion, up 25.9%. Operating income was ¥46.0 billion, up 44.4%. That is an operating margin of 21.2%, against 18.5% a year earlier, by our arithmetic. On 10 November 2026 TOK raised its full-year sales forecast to ¥300.0 billion from ¥291.0 billion, up 26.6% on 2025.

Quarter by quarter, the resist division climbed from ¥27.8 billion in the first quarter of 2025 to ¥41.6 billion in the third quarter of 2026. That is 1.5 times in six quarters, by our arithmetic.

What is photoresist chart: Tokyo Ohka Kogyo electronic functional materials sales by quarter, from ¥27.8 billion in Q1 2025 to ¥41.6 billion in Q3 2026
TOK’s resist division by quarter, in yen. Chart by Second Order.

One caution. TOK reports in yen, and the yen was weaker. Its average rate was ¥157.7 to the US dollar in the nine months, against ¥146.8 a year earlier, so each dollar of overseas sales counted for about 7.4% more yen. TOK’s own bridge puts ¥3.5 billion of its ¥14.2 billion profit gain down to currency and price changes, about a quarter, by our arithmetic. The rest it puts down to higher sales and product mix.

Fujifilm gives a sense of where the growth sits. In its 2024 launch it cited a forecast from Fuji Chimera Research Institute that the EUV resist market would grow about 20% a year. At that pace a market doubles in under four years, by our arithmetic.

Who gets paid?

Photoresist pays several groups, each in a different way.

  • Resist makers, by the batch. TOK, JSR, Fujifilm and others are paid for the resist a fab uses. Every wafer start and every patterned layer uses more. TOK’s resist division grew 27.3% in the nine months to September 2026.
  • Track makers, by the machine. Coater-developers sit beside every scanner, so every new fab line needs new tracks.
  • Scanner makers, indirectly. A better resist lets a scanner print more wafers an hour at the same quality. That makes each scanner worth more to the fab.
  • Dry resist toolmakers. Lam is paid for machines rather than material. If dry resist spreads, some of the money that would have gone to liquid resist goes to tools instead.
  • Owners. JIC now owns JSR, so JSR’s resist profits flow to a state-backed fund rather than to public shareholders.

Our read: the resist makers are paid in small amounts, but very often and for a long time. Once a resist is qualified on a line, it tends to stay until the next node. That steady pull is why the business looks so different from the lumpy tool orders in our who makes wafer fab equipment page.

Where is the stuck step?

The stuck step is qualification: the testing a chipmaker runs before it lets a new resist onto a production line.

A resist is not a commodity you can swap like for like. THE ELEC reported on 21 October 2026 that EUV resist must make even, nanometre-scale patterns with very few defects, and that its properties must be adjusted to each customer’s process and checked again and again. That makes development and qualification slow.

Fujifilm’s own timeline shows the clock. It began selling EUV resist on 29 October 2024. Its new lines in Shizuoka and Pyeongtaek began operating in October 2025. On 21 October 2026, about 24 months after the launch and 12 months after the lines started, a Fujifilm executive said some EUV resists had passed tests at major customers, but full-scale mass production had not begun.

Lam’s dry resist shows the same clock from the tool side. Lam says it introduced dry resist in 2020. A memory maker chose it as the production tool of record for its most advanced DRAM in January 2025, about five years later.

Our read: that slow swap protects whoever is already qualified. A chipmaker will not risk a whole line of wafers to save a little on resist. So the stuck step is not supply of the chemical. It is the time it takes to trust a new one. Our semiconductor yield explained page explains why one bad material can cost a fab far more than the material itself.

What happened when Japan tightened photoresist exports in 2019?

It showed how much one small material can matter. In July 2019 Japan’s trade ministry moved exports of three materials to South Korea, photoresist among them, from bulk licences to case-by-case review. The other two were hydrogen fluoride and fluorinated polyimide.

The Korea Economic Institute of America, looking back on 13 April 2020, said photoresist makers were first allowed to export under the new rule in August 2019. In December Japan eased the rule for photoresist to a special general bulk licence. That is about five months from start to easing, by our arithmetic.

KEIA stressed that Japan did not ban the exports outright. It added paperwork, delay and doubt. Our read: that was enough to teach chipmakers to want resist made close by and from more than one source. Fujifilm’s choice of Pyeongtaek, near Samsung, fits that lesson.

Photoresist in Japan, Korea and Taiwan

The best-known makers are Japanese, while many of the biggest users are fabs in Korea and Taiwan. That is why makers are moving production closer to the fabs.

THE ELEC reported that Fujifilm makes chip materials near Samsung in Pyeongtaek and Texas, and near TSMC, UMC and others in Hsinchu and Tainan in Taiwan and in Arizona. Our Markets note on Samsung’s full memory lines shows why Korean fabs want every input close at hand, and our note on UMC’s Lam delivery clock follows a Taiwanese fab waiting on tools.

For investors in Singapore and across Asia, the point is simple. The chip names get the attention, but the fabs in Korea and Taiwan depend on a handful of Japanese materials makers for a coat they cannot easily switch.

The clocks

  • Now. Fujifilm’s Pyeongtaek EUV resist line: some products qualified, full-scale mass production not yet started, as at 21 October 2026.
  • After 31 December 2026. TOK reports its full year. Its forecast is ¥300.0 billion of sales and ¥63.5 billion of operating income; it had reached 72.5% of the sales forecast after nine months.
  • As EUV spreads in memory. Lam’s dry resist is in production for a memory maker’s most advanced DRAM. Wider use would move some spending from resist to tools.
  • As High-NA EUV arrives. Smaller features mean even fewer photons per spot, and another round of resist qualification.

What would change the view?

  • A challenger qualifies fast. If Fujifilm or another maker reaches full-scale EUV resist production at a major fab soon, the qualification clock is shorter than we think.
  • Dry resist spreads widely. If dry resist moves from one memory maker into logic fabs, more of the money shifts from chemical makers to toolmakers.
  • Resist growth tracks currency, not volume. If TOK’s growth fades once the yen stops weakening, the AI demand story is smaller than the headline.
  • A new supply shock. Another export rule on resist, from any country, would test how far makers have really moved production close to fabs.

Common misconceptions

  • People assume the scanner does all the work. Actually, the scanner only shines light. Without a resist tuned to that light, there is no pattern on the wafer.
  • People assume photoresist stays on the chip. Actually, it is stripped off after each layer is etched. It is a temporary stencil, used and removed many times per wafer.
  • People assume any maker’s resist will do. Actually, each resist is tuned and tested for one chipmaker’s process. Fujifilm’s new EUV line still was not in full production a year after it started.

FAQ

What is photoresist?
Photoresist is a light-sensitive coating spread on a silicon wafer. A lithography machine shines a chip’s pattern onto it, a developer washes part of it away, and what is left acts as a stencil while the wafer is etched. Then it is stripped off and the cycle repeats for the next layer.

What is photoresist made of?
Most modern photoresists are a polymer dissolved in a solvent, plus a chemical that reacts to light. In the common chemically amplified type, light makes a small amount of acid, and heat lets that acid change the polymer so the developer can wash it away. Newer EUV resists also use metal oxides.

What is the difference between positive and negative photoresist?
With a positive process, the parts hit by light wash away. With a negative process, the parts not hit by light wash away. Fujifilm describes its negative-tone imaging process as removing the unexposed areas with the developer.

What is EUV photoresist?
EUV photoresist is resist made for extreme ultraviolet light, which has a wavelength of 13.5 nanometres, more than 14 times shorter than the 193-nanometre light of ArF tools. It has to form very small, even patterns with very few defects, which makes it hard to develop and slow to qualify.

Who makes photoresist?
Japanese chemical companies are the best-known makers, including Tokyo Ohka Kogyo (TOK), JSR and Fujifilm. JSR also owns Inpria, which makes metal-oxide EUV resist in Oregon. Lam Research sells tools for a dry resist process that replaces part of the liquid resist step.

Why is photoresist hard to replace?
Because each resist is tuned to one chipmaker’s process and tested again and again before it is used in production. Fujifilm began selling EUV resist in October 2024 and started new lines in October 2025, but as at 21 October 2026 its Pyeongtaek line was still not in full-scale mass production.

How much do photoresist makers earn?
Tokyo Ohka Kogyo, a listed Japanese resist maker, reported ¥115.8 billion of sales in its electronic functional materials division, which holds its photoresists, in the nine months to September 2026, up 27.3% from a year earlier. The division was 53.2% of the company’s sales, by our arithmetic.

Can a country cut off photoresist supply?
It has happened once in a mild form. In July 2019 Japan moved photoresist exports to South Korea from bulk licences to case-by-case review. The first photoresist exports were approved in August, and the rule was eased to a special bulk licence in December, about five months later.

Related: photomask explained; EUV lithography explained; EUV vs DUV; High-NA EUV explained; semiconductor yield explained; tape-out explained.

Stack doors

Layer: Semiconductors. Toolmakers next to the resist: Tokyo Electron, ASML and Lam Research. For the scanner supply clock, see our Wire on ASML’s 2027 and 2028 supply and the Analysis if ASML supply stays short.

Get the Wire — short daily notes on where AI computing gets built and who pays for it.

Not investment advice. Do your own research.

How we check this

Light wavelengths and feature sizes come from ASML’s own page on lithography light sources, read on 26 November 2026. How resist works and how it is changing comes from Fujifilm’s EUV resist launch of 29 October 2024 and Lam Research’s dry resist release of 29 January 2025. The qualification clock comes from THE ELEC’s interview with Fujifilm published on 21 October 2026. Tokyo Ohka Kogyo figures come from its third-quarter results deck of 10 November 2026. JSR deal figures come from JSR’s Tokyo Stock Exchange disclosure of 29 October 2021 and JIC Capital’s tender result of 17 April 2024, both read in Japanese. The 2019 Japan and Korea episode comes from the Korea Economic Institute of America’s analysis of 13 April 2020. TOK does not report photoresist sales on their own, so we use its electronic functional materials division, which holds them, and say so each time. Its figures are in yen, and the yen was about 7.4% weaker against the US dollar than a year earlier, so part of the growth is currency. Every ratio and percentage not quoted from a source is our arithmetic, checked in code. We do not quote market shares, because we could not find a current primary figure. Who gets paid and the stuck step are our read, labelled as such. The featured image is a CC BY-SA 4.0 photograph of a wafer on a spin coater, with a grade added by us; it is illustrative and not tied to any company named here. This page explains how a chip material works. It does not rate any company as an investment or give buy or sell calls. Not investment advice. Do your own research.

Last reviewed: 26 Nov 2026 · Next review: when Tokyo Ohka Kogyo reports its full year to 31 December 2026, or when Fujifilm says its Pyeongtaek EUV resist line is in full-scale mass production

Spot an error? Tell us and we will correct it and note the change here.

Our editorial standards →

References

  1. Tokyo Ohka Kogyo (TOK) — business results, third quarter of the year to December 2026 (10 Nov 2026) — Nine-month sales ¥217.5bn, up 25.9%; electronic functional materials ¥115.8bn, up 27.3%; operating income ¥46.0bn, up 44.4%; full-year forecast raised to ¥300.0bn; average rate ¥157.7 per US dollar against ¥146.8 a year earlier
  2. Fujifilm — launch of EUV resist and EUV developer (29 Oct 2024) — Sales of negative-tone EUV resist and developer begin; production and quality checks expanded at Shizuoka, Japan and Pyeongtaek, South Korea, operating from October 2025; EUV resist market projected to grow about 20% a year; about 17% less line-width roughness
  3. THE ELEC — Fujifilm prepares for EUV photoresist mass production in Pyeongtaek (21 Oct 2026) — EUV resist being made in Pyeongtaek, some products passed qualification at major customers, full-scale mass production not yet started; qualification is time-consuming; suppliers use imec’s EUV tools
  4. Lam Research — Aether dry photoresist adopted by a leading memory maker (29 Jan 2025) — Dry resist, introduced by Lam in 2020, selected as production tool of record for the most advanced DRAM; five to ten times less chemicals than wet resist processes
  5. JSR — completion of the acquisition of Inpria, Tokyo Stock Exchange disclosure, in Japanese (29 Oct 2021) — Inpria, maker of metal-oxide EUV resist in Oregon, acquired for about US$421m (about ¥46.7bn); JSR held 21.3% before the deal
  6. JIC Capital — result of the tender offer for JSR, in Japanese (17 Apr 2024) — Tender at ¥4,350 a share; 175,272,231 shares tendered against a minimum of 138,507,100; settlement from 23 April 2024
  7. Korea Economic Institute of America — Disrupting supply chains: evidence on the Japan-Korea conflict (13 Apr 2020) — Japan moved photoresist exports to Korea to individual review in July 2019; first photoresist exports permitted in August; eased to a special general bulk licence in December
  8. ASML — Light and lasers, lithography principles (page read 26 Nov 2026) — Light used in lithography: mercury g-line 436 nm and i-line 365 nm, KrF 248 nm, ArF 193 nm, EUV 13.5 nm

Sean

Writes Second Order by TKN — a plain-English map of AI infrastructure and semiconductors for non-specialist investors. Focus: who gets paid, where money sticks, and which step is stuck.

Covers AI infrastructure, semiconductors, and second-order stack reads.

Author page → · Editorial standards →