Explained
Who Makes HBM
Who makes HBM is the map of roles along the stack — memory makers, package attach, and tools. Allocation locks are not settled cash. Roles only. No tip sheet.
Explained
Mechanism explainers for the AI stack — what a part is, why it binds, who gets paid. Free teaching desk on Second Order.
Get the Wire
Explained
Who makes HBM is the map of roles along the stack — memory makers, package attach, and tools. Allocation locks are not settled cash. Roles only. No tip sheet.
Explained
HBM stacks beside the GPU on advanced packaging; GDDR sits as discrete chips on the board. Same memory family tree — different stuck step and who gets paid.
Explained
A neocloud is a specialist cloud that bills GPU clusters for AI work. What it is, how it earns, and why utilisation and realised price decide everything.
Explained
CoWoS is chip-on-wafer-on-substrate — TSMC’s packaging family that joins a compute die and HBM. How variants differ, and why hectares on a form are not packaging slots.
Explained
A neocloud bills accelerator time; a hyperscaler sells a broad cloud with GPUs as one line. Compare funding, pricing, lock-in, and what a demand dip hits.
Explained
Behind-the-meter power is on-site electricity on the customer's side of the utility meter. Leased megawatts do not pay until the hall is energised — and the queue is why that gap exists.
Explained
Advanced packaging still needs substrates and ABF film. The quiet neighbour gate — and how inventory builds when materials lag.
Explained
Process tools set HBM bit growth months before stacks ship. The equipment gate, the install-to-output clock, and where cash sits on the supply curve.
Explained
AI chips finish when foundry, packaging, HBM, substrates, and test all match. The wider finish line beyond one packaging brand name.
Explained
Software turns expensive compute into paid workflows. Where app-layer rent sits — and why it runs on a different clock from fabs.
Explained
Servers turn chips, networking, and power into a deployable rack. This Map explains what fills the box — and when system lead times become the gate.
Explained
Speed-to-power is the clock from plan to live watts at the rack. Chip news alone misses this gate — and who gets paid when timed megawatts clear.